Difference between revisions of "gorakhpur-link-expressway"
(Created page with "{{DISPLAYTITLE: Gorakhpur Link Expressway 2025: Complete Guide - Newly Inaugurated Eastern UP Connector}} {{#seo:|title=Gorakhpur Link Expressway 2025: Complete Guide - Newly...") |
|||
Line 333: | Line 333: | ||
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;"> | <ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;"> | ||
<li>[[purvanchal-expressway|Purvanchal Expressway]] - Main connection at Azamgarh/Salarpur</li> | <li>[[purvanchal-expressway|Purvanchal Expressway]] - Main connection at Azamgarh/Salarpur</li> | ||
− | <li>[[uttar-pradesh-toll- | + | <li>[[uttar-pradesh-toll-roads|Uttar Pradesh Toll Roads]] - Complete UP expressway network</li> |
<li>[[india-toll|India Toll]] - National toll road system information</li> | <li>[[india-toll|India Toll]] - National toll road system information</li> | ||
</ul> | </ul> |
Latest revision as of 11:09, 8 July 2025
Click on the map to open toll wiki for a country/state
Gorakhpur Link Expressway Complete Guide
Route: Jaitpur (Gorakhpur) to Salarpur (Azamgarh) - 91.35 km
System: 4-lane access-controlled expressway (expandable to 6)
Toll Rate: ₹2.20/km (₹200 full journey for cars)
Connection: Links Gorakhpur to Purvanchal Expressway at Azamgarh
Inaugurated: June 20, 2025 by CM Yogi Adityanath
Do I Need FASTag for Gorakhpur Link Expressway? 2025 Update
Yes, FASTag is highly recommended for seamless travel on the newly opened Gorakhpur Link Expressway. The expressway features modern toll collection systems with both FASTag and cash payment options at its 2 toll plazas.
Key Reality: This newest addition to UP's expressway network provides the missing link between Gorakhpur and the Purvanchal Expressway, dramatically reducing travel time from Gorakhpur to Lucknow from 6 hours to just 3.5 hours.
2025 Update: Inaugurated on June 20, 2025, by CM Yogi Adityanath, this expressway represents UP's 7th operational expressway and extends the state's access-controlled network to eastern districts previously underserved by modern highway infrastructure.
Gorakhpur Link Expressway Toll Costs: Current Rates
The Gorakhpur Link Expressway operates on distance-based pricing at ₹2.20 per kilometer, making it cost-effective for the significant time savings provided to eastern UP travelers.
Current Toll Rates - 2025
Vehicle Type | Full Journey (91.35 km) | Per KM Rate | Time Savings |
---|---|---|---|
Car/Jeep/Van | ₹200 | ₹2.20/km | 1.5 hours saved |
Light Commercial Vehicle | ₹320 | ₹3.50/km | 1.5 hours saved |
Bus/Truck (2-Axle) | ₹650 | ₹7.10/km | 2 hours saved |
Heavy Vehicle (3+ Axles) | ₹990 | ₹10.85/km | 2 hours saved |
Strategic Route Connections
Route | Old Travel Time | New Travel Time | Time Saved |
---|---|---|---|
Gorakhpur to Lucknow | 6 hours | 3.5 hours | 2.5 hours (42%) |
Gorakhpur to Delhi | 10-11 hours | 7-8 hours | 3 hours (30%) |
Gorakhpur to Agra | 9 hours | 6.5 hours | 2.5 hours (28%) |
Gorakhpur to Ayodhya | 4 hours | 2.5 hours | 1.5 hours (38%) |
How to Pay Gorakhpur Link Expressway Tolls
The newly operational expressway features modern toll collection infrastructure across its 2 toll plazas:
1. FASTag (Recommended):
- Automatic toll deduction using RFID technology
- Works at both toll plazas on the expressway
- Interoperable with all UP expressways and 350+ toll plazas nationwide
- Faster lane movement with no stopping required
2. Cash Payment:
- Available at manned toll booths
- Same rates as FASTag (no additional charges)
- Recommended to carry exact change for faster processing
- Longer waiting times expected during peak hours
3. Digital Integration:
- ANPR (Automatic Number Plate Recognition) system
- Integration with UPEIDA's Expressway Mitra app
- Real-time traffic monitoring and incident reporting
Route & Districts Connected
The Gorakhpur Link Expressway passes through 4 districts in eastern Uttar Pradesh, providing crucial connectivity to previously underserved regions.
Districts Connected (West to East)
- Gorakhpur - Major eastern UP city, starting point at Jaitpur village on NH-27
- Sant Kabir Nagar - Agricultural district with significant rural population
- Ambedkar Nagar - Educational and administrative center in eastern UP
- Azamgarh - Connection point to Purvanchal Expressway at Salarpur village
Land Acquisition & Development
- Total Land Acquired: 1,148.8 hectares from 172 villages
- Farmer Compensation: ₹2,030 crore paid to over 22,000 farmers
- Acquisition Model: Peaceful process with fair compensation
- Construction Approach: EPC (Engineering, Procurement, Construction) mode
Infrastructure & Technical Features
Complete Infrastructure Portfolio
Infrastructure Type | Quantity | Purpose |
---|---|---|
Toll Plazas | 2 | Revenue collection and traffic management |
Ramp Plazas | 3 | Entry/exit point management |
Flyovers | 7 | Grade-separated crossings |
Major Bridges | 7 | River and major road crossings |
Minor Bridges | 27 | Local drainage and crossings |
Vehicular Underpasses | 16 | Local road connectivity |
Light Vehicle Underpasses | 50 | Smaller vehicle access |
Pedestrian Underpasses | 35 | Safe pedestrian crossings |
Advanced Technology Systems
- CCTV Surveillance: Comprehensive monitoring along entire route
- ANPR Technology: Automatic number plate recognition for security
- Speed Monitoring: Electronic speed enforcement systems
- Traffic Management: Advanced traffic management systems (ATMS)
- Emergency Response: Dedicated helpline and patrol vehicles
Construction Challenges Overcome
- Low-lying Terrain: Special soil filling techniques used in Gorakhpur region
- Flood-prone Areas: Enhanced drainage and elevated construction
- Quality Construction: Built to withstand annual monsoon challenges
- Rapid Completion: Finished ahead of schedule despite terrain challenges
Project Timeline & Development
Key Milestones
Date | Milestone | Progress |
---|---|---|
2018 | Project Announced | CM Yogi Adityanath conceptualizes project |
February 2019 | Land Acquisition Begins | Peaceful acquisition process initiated |
October 2019 | 50% Land Acquired | Construction divided into 2 packages |
2020-2022 | Construction Phase | APCO Infratech and Dilip Buildcon execution |
May 2024 | Near Completion | 98% construction work completed |
June 20, 2025 | Official Inauguration | CM Yogi Adityanath opens to public |
Construction Partnership
- Package I: Jaitpur to Phulwaria (48.3 km) - APCO Infratech
- Package II: Phulwaria to Salarpur (43.0 km) - Dilip Buildcon
- Total Project Cost: ₹5,876 crore (including land acquisition)
- Construction Cost: ₹3,024 crore (excluding land)
Economic Impact & Regional Development
Immediate Benefits (2025)
- Travel Time Reduction: Gorakhpur-Lucknow journey cut by 2.5 hours
- Fuel Efficiency: 30-40% reduction in fuel consumption due to smooth flow
- Pollution Reduction: Lower emissions from reduced congestion
- Emergency Access: Faster medical and emergency services connectivity
- Educational Access: Easier travel to major educational centers
Long-term Economic Impact
- Industrial Development: Enhanced logistics for handloom, dairy, food processing
- Agricultural Markets: Direct connectivity for farmers to major urban markets
- Tourism Growth: Improved access to religious sites in eastern UP
- Real Estate Boom: Property value increases in connected districts
- Employment Generation: Jobs in logistics, services, and manufacturing sectors
Strategic Positioning
- UP Network Integration: Completes eastern connectivity in state expressway grid
- National Connectivity: Links eastern UP to Delhi-Mumbai industrial corridor
- Border Trade: Enhanced connectivity toward Nepal border region
- Future Expansion: Foundation for planned Gorakhpur-Siliguri Expressway
Frequently Asked Questions
When was the Gorakhpur Link Expressway opened?
The expressway was officially inaugurated on June 20, 2025, by CM Yogi Adityanath, making it UP's 7th operational expressway and the newest addition to the state's access-controlled highway network.
How much time does it save for Gorakhpur-Lucknow travel?
The journey from Gorakhpur to Lucknow is reduced from 6 hours to just 3.5 hours - a savings of 2.5 hours (42% reduction). This dramatic improvement connects eastern UP much more efficiently to the state capital.
Are two-wheelers allowed on this expressway?
No, motorcycles, scooters, and three-wheelers are prohibited for safety reasons. The expressway is designed as an access-controlled highway for four-wheelers and above, with speed limits up to 100 km/h for cars.
How does this expressway connect to other UP expressways?
It connects directly to the Purvanchal Expressway at Salarpur in Azamgarh, which then links to the Agra-Lucknow Expressway at Lucknow, creating a seamless route from Gorakhpur to Delhi via the Yamuna Expressway.
What was the total cost of the project?
The total project cost was ₹5,876 crore including land acquisition (₹2,030 crore for farmer compensation), with construction costs of ₹3,024 crore. The project acquired 1,148.8 hectares from 172 villages.
Useful Links & Resources
Related Expressways:
- Purvanchal Expressway - Main connection at Azamgarh/Salarpur
- Uttar Pradesh Toll Roads - Complete UP expressway network
- India Toll - National toll road system information
Emergency Contacts:
- UPEIDA Helpline: 1800-419-0139 (24/7)
- Emergency Services: 112
- Expressway Patrol: Available along route
- Medical Emergency: Nearest hospitals in Gorakhpur and Azamgarh