From Toll Wiki

 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 +
{{DISPLAYTITLE: Turkmenistan Toll Roads 2025: Complete Highway Guide}}
 +
{{#seo:|title=Turkmenistan Toll Roads 2025: Complete Highway Guide}}
 +
{{#seo:|keywords=Turkmenistan tolls, Ashgabat-Turkmenabat highway, Turkmen toll roads, Central Asia highways, Turkmenistan toll rates}}
 +
{{#seo:|description=Complete 2025 guide to Turkmenistan toll roads, Ashgabat-Turkmenabat highway status, planned toll systems, and Central Asian highway connections.}}
 +
{{#canonics: https://tollguru.com/toll-wiki/turkmenistan-toll}}
 
{{worldMap}}
 
{{worldMap}}
  
 +
__TOC__
 
<div class="shadowCard">
 
<div class="shadowCard">
  
= Turkmenistan Toll Roads 2025: Complete Guide =
+
<h1 style="font-size: 32px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 10px 0; border-bottom: 3px solid #a2a9b1; padding-bottom: 5px; padding-top: 0">Turkmenistan Toll Roads 2025: Complete Highway Guide</h1>
  
<div style="background: #ffffff; border: 1px solid #dee2e6; border-radius: 8px; padding: 20px; margin-bottom: 20px;">
+
<div style="background: #ffffff; border: 1px solid #dee2e6; border-radius: 8px; padding: 20px; padding-bottom:0">
<div style="color: #6c757d; font-size: 14px;">
+
<div style="color: #202122; font-size: 16px; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6;">
'''System:''' Planned/Under Construction<br>
+
<strong style="font-weight: bold;">System:</strong> Planned electronic toll collection (operational 2025-2027)<br>
'''Operator:''' Turkmen Awtoban (JSC)<br>
+
<strong style="font-weight: bold;">Operator:</strong> Türkmen Awtoban CJSC<br>
'''Currency:''' Turkmen Manat (TMT)<br>
+
<strong style="font-weight: bold;">Currency:</strong> Turkmen Manat (TMT)<br>
'''Coverage:''' Limited - major highways under development<br>
+
<strong style="font-weight: bold;">Technology:</strong> Electronic toll collection with video surveillance<br>
'''Technology:''' Electronic toll collection planned
+
<strong style="font-weight: bold;">Coverage:</strong> Toll rates range from 0.35 to 0.45 Turkmen manats per kilometer (operational sections only)
 
</div>
 
</div>
 
</div>
 
</div>
  
<div style="text-align: center; margin: 20px 0;">
+
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Do I Need to Pay Tolls in Turkmenistan? 2025 Update</h2>
[https://tollguru.com/toll-calculator-turkmenistan Calculate Turkmenistan Toll]
 
</div>
 
  
== Do I Need to Pay Tolls in Turkmenistan? 2025 Update ==
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Currently, most roads in Turkmenistan are toll-free, but this is changing rapidly. The Ashgabat-Turkmenabat highway sections are now operational with toll collection, while the final Mary-Turkmenabat section completion is scheduled for 2025.</p>
  
Currently, '''Turkmenistan has no operational toll roads''' for regular passenger vehicles. However, major toll highway projects are under construction and will become operational in the coming years.
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;"><strong style="font-weight: bold;">Key Reality:</strong> The Ashgabat-Turkmenabat and Ashgabat-Turkmenbashi highways will be toll roads, with initially only heavy vehicles engaged in commercial transportation required to pay.</p>
  
'''Current Status:'''
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;"><strong style="font-weight: bold;">2025 Status:</strong> The Mary-Turkmenabat section construction and commissioning is being completed in 2025, making the 600-kilometer Ashgabat-Turkmenabat highway fully operational with electronic toll collection.</p>
* Most roads in Turkmenistan are currently toll-free
 
* Major toll highway projects under construction since 2019
 
* Planned toll system will initially target commercial vehicles
 
* Future toll roads will feature electronic collection systems
 
  
'''Planned Toll Infrastructure:'''
+
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Turkmenistan Toll Costs: Current Rates</h2>
* '''Ashgabat-Turkmenabat Highway''' - 640km major project (under construction)
 
* '''Ashgabat-Turkmenbashi Highway''' - connects capital to Caspian Sea port
 
* '''Turkmenbashi-Garabogaz Highway''' - extension to Kazakhstan border
 
  
== Turkmenistan Road Infrastructure: Current Status ==
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Turkmenistan operates a distance-based toll system on its modern highways, with rates varying by vehicle type and route section.</p>
  
As of 2025, Turkmenistan's road network consists primarily of conventional highways without toll systems.
+
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 20px 0 10px 0;">Current Toll Rates by Vehicle Class (2025)</h3>
  
=== Current Road Network ===
+
<div style="overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 20px 0;">
 
+
<table style="width: 100%; min-width: 600px; border-collapse: collapse; font-size: 16px; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; color: #202122; outline: 1px solid #dee2e6;">
<table class="toll-table">
+
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Vehicle Type</th>
 +
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Rate per km (TMT)</th>
 +
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">USD Equivalent</th>
 +
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Status</th>
 +
</tr>
 +
<tr>
 +
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Passenger Cars</td>
 +
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">0.35-0.45</td>
 +
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">$0.10-0.13</td>
 +
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Operational on completed sections</td>
 +
</tr>
 
<tr>
 
<tr>
<th>Road Type</th>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Commercial Vehicles</td>
<th>Length</th>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Higher rates (TBD)</td>
<th>Status</th>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">TBD</td>
<th>Toll Status</th>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Primary toll target</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Total road network</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Heavy Trucks</td>
<td>22,000 km</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Premium rates</td>
<td>Operational</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">TBD</td>
<td>Free</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Full implementation planned</td>
 +
</tr>
 +
</table>
 +
</div>
 +
 
 +
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 20px 0 10px 0;">Operational Toll Highways (2025)</h3>
 +
 
 +
<div style="overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 20px 0;">
 +
<table style="width: 100%; min-width: 600px; border-collapse: collapse; font-size: 16px; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; color: #202122; outline: 1px solid #dee2e6;">
 +
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Highway Section</th>
 +
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Length</th>
 +
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Status</th>
 +
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Opening Date</th>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Paved roads</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Ashgabat-Tejen</td>
<td>18,000 km</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">203 km</td>
<td>Operational</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Operational</td>
<td>Free</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">October 2021</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>International highways</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Tejen-Mary</td>
<td>2,280 km</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">109 km</td>
<td>Operational</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Operational</td>
<td>Free</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">April 2024</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>National importance roads</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Mary-Turkmenabat</td>
<td>6,540 km</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">288 km</td>
<td>Operational</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Completion 2025</td>
<td>Free</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">End 2025</td>
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
</div>
 +
 +
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">How to Pay Turkmenistan Tolls</h2>
  
=== Major Highway Routes (Currently Free) ===
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Turkmenistan's toll system features modern electronic payment methods with automatic vehicle detection and surveillance systems.</p>
  
* '''M37 Highway:''' Turkmenbashi to Farap border (west-east route)
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Electronic Payment System:</strong></p>
* '''Ashgabat-Dashoguz Road:''' Primary north-south route
+
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
* '''European Routes:''' E003, E60, E121 (international connections)
+
<li>Payment terminals providing electronic payments located at highway intersections</li>
* '''Asian Highway Routes:''' AH5, AH70, AH75, AH77, AH78
+
<li>Traffic controlled by automatic system using continuous video surveillance</li>
 +
<li>License plate recognition for toll collection</li>
 +
<li>Prepaid accounts and electronic payment options</li>
 +
</ul>
  
== Planned Toll Road Projects ==
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Highway Features:</strong></p>
 +
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
 +
<li>Eight lanes total (three main lanes plus one auxiliary lane each direction)</li>
 +
<li>Total road width of 34.5 meters</li>
 +
<li>Speed limits up to 130 km/h on toll highways</li>
 +
<li>Traffic control services and recreation areas at payment terminals</li>
 +
</ul>
  
=== Ashgabat-Turkmenabat Highway (Under Construction) ===
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;">To calculate toll costs for all vehicle types across Turkmenistan toll roads, use TollGuru Turkmenistan toll calculator</p>
 +
 
 +
<div style="text-align: center; margin: 20px 0;">
 +
<html>
 +
<a href="https://tollguru.com/toll-calculator-asia"><button class="custom-button button-orange" type="button">Turkmenistan Toll Calculator</button></a>
 +
</html>
 +
</div>
  
'''Project Details:'''
+
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Recent Changes (2025)</h2>
* '''Length:''' 640 kilometers
 
* '''Investment:''' $2.3 billion
 
* '''Contractor:''' Turkmen Awtoban JSC
 
* '''Completion:''' Phased completion through 2025
 
* '''Features:''' 8-lane dual carriageways, electronic toll collection
 
  
'''Construction Phases:'''
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Major Infrastructure Completion:</strong></p>
* '''Phase 1:''' Ashgabat-Tejen (completed)
+
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
* '''Phase 2:''' Tejen-Mary (under construction)
+
<li>Mary-Turkmenabat section construction and commissioning being completed in 2025</li>
* '''Phase 3:''' Mary-Turkmenabat (planned completion 2025)
+
<li>Full 600-kilometer Ashgabat-Turkmenabat motorway nearing completion</li>
 +
<li>New Ashgabat-Turkmenbashi highway segment construction launching in 2026</li>
 +
</ul>
  
'''Planned Toll Features:'''
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Toll System Implementation:</strong></p>
* Electronic toll collection system
+
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
* Speed limits up to 130 km/h
+
<li>Electronic toll collection operational with distance-based rates</li>
* Multiple road junctions and interchanges
+
<li>Commercial vehicles initially targeted for toll collection</li>
* Initially targeting commercial vehicles
+
<li>Full toll implementation across all vehicle types planned for 2025-2027</li>
 +
</ul>
  
=== Other Planned Projects ===
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">International Connectivity:</strong></p>
 +
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
 +
<li>Discussions underway with international financial institutions for railway modernization</li>
 +
<li>Highway designed to provide freight trucks direct access to Turkmenbashi International Seaport</li>
 +
<li>Enhanced connectivity to Caucasus, Europe, Iran, and Persian Gulf regions</li>
 +
</ul>
  
* '''Turkmenbashi-Garabogaz Highway:''' Extension to Kazakhstan border
+
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Planning Your Journey</h2>
* '''Cross-border connectivity:''' Enhanced links to Iran, Afghanistan, Uzbekistan
 
* '''Port connections:''' Improved access to Caspian Sea ports
 
  
== Current Travel in Turkmenistan ==
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Cost Considerations:</strong></p>
 +
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
 +
<li>Ashgabat-Turkmenabat full journey: ~$30-40 for passenger cars (600km)</li>
 +
<li>Commercial vehicles: Premium rates apply</li>
 +
<li>Alternative free roads: Available but significantly slower</li>
 +
<li>International transit: Competitive with regional routes</li>
 +
</ul>
  
=== Cost Considerations ===
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Travel Requirements:</strong></p>
* '''Current roads:''' No toll charges for any vehicles
+
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
* '''Fuel costs:''' Among world's lowest (approximately $1.62/gallon)
+
<li>Visa required for most international visitors</li>
* '''Future tolls:''' Commercial vehicles likely to be charged first
+
<li>Transit permits needed for some routes</li>
* '''Border crossings:''' No toll fees at international borders
+
<li>International driving permit recommended</li>
 +
<li>Border crossings operate daytime hours only</li>
 +
</ul>
  
=== Travel Requirements ===
+
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Frequently Asked Questions</h2>
* '''Visa required:''' For most international visitors
 
* '''Transit permits:''' Required for some routes
 
* '''Border controls:''' All crossings operate daytime hours only
 
* '''Documentation:''' Vehicle registration and insurance required
 
  
== Turkmenistan vs. Neighboring Countries ==
+
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Are there currently toll roads in Turkmenistan?</h3>
 +
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Yes, sections of the Ashgabat-Turkmenabat highway are operational with electronic toll collection. The full 600km route will be completed by end 2025.</p>
  
<table class="toll-table">
+
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">What vehicles need to pay tolls?</h3>
<tr>
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Currently, all vehicle types pay tolls on operational highway sections. Commercial vehicles were initially the primary target but the system now includes passenger cars.</p>
<th>Country</th>
 
<th>System Type</th>
 
<th>Current Status</th>
 
<th>Coverage</th>
 
<th>Notes</th>
 
</tr>
 
<tr>
 
<td>Turkmenistan</td>
 
<td>No tolls (planned)</td>
 
<td>Construction phase</td>
 
<td>Major highways planned</td>
 
<td>Future electronic system</td>
 
</tr>
 
<tr>
 
<td>Iran</td>
 
<td>Limited tolls</td>
 
<td>Operational</td>
 
<td>Selected highways</td>
 
<td>Electronic collection</td>
 
</tr>
 
<tr>
 
<td>Afghanistan</td>
 
<td>No toll system</td>
 
<td>No tolls</td>
 
<td>Free roads</td>
 
<td>Infrastructure developing</td>
 
</tr>
 
<tr>
 
<td>Uzbekistan</td>
 
<td>Planned toll roads</td>
 
<td>Under development</td>
 
<td>Major routes planned</td>
 
<td>Private financing model</td>
 
</tr>
 
<tr>
 
<td>Kazakhstan</td>
 
<td>Expanding toll network</td>
 
<td>Operational/expanding</td>
 
<td>500+ km planned</td>
 
<td>Electronic systems</td>
 
</tr>
 
</table>
 
  
== Transportation in Turkmenistan ==
+
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Can I avoid tolls in Turkmenistan?</h3>
 +
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Yes, alternative free roads remain available, but toll highways offer significantly faster travel times with speeds up to 130 km/h.</p>
  
=== Road Transport ===
+
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">How much does it cost to drive across Turkmenistan?</h3>
* '''Primary mode:''' 96% of domestic transport by road
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">The full Ashgabat-Turkmenabat journey (600km) costs approximately $30-40 for passenger cars, with commercial vehicles paying premium rates.</p>
* '''Fuel prices:''' State-controlled, heavily subsidized
 
* '''Vehicle registration:''' Managed by provincial governments
 
* '''Commercial transport:''' Regulated by Automobile Services Agency
 
  
=== International Connections ===
+
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Do I need special documents for Turkmenistan toll roads?</h3>
* '''Cross-border routes:''' Direct highways to all neighboring countries
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">International visitors need valid visas, international driving permits, and vehicle documentation. Some routes may require transit permits.</p>
* '''Transit agreements:''' Part of international transport corridors
 
* '''Customs procedures:''' Required at all international borders
 
* '''Documentation:''' International driving permits recommended
 
  
== Border Crossings & Routes ==
+
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Turkmenistan vs. Neighboring Countries</h2>
  
=== Major Border Points ===
+
<div style="overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 20px 0;">
<table class="toll-table">
+
<table style="width: 100%; min-width: 600px; border-collapse: collapse; font-size: 16px; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; color: #202122; outline: 1px solid #dee2e6;">
 +
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Country</th>
 +
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">System Type</th>
 +
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Current Status</th>
 +
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Coverage</th>
 +
</tr>
 
<tr>
 
<tr>
<th>Country</th>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Turkmenistan</td>
<th>Border Length</th>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Electronic toll collection</td>
<th>Major Crossings</th>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Operational/Expanding</td>
<th>Operating Hours</th>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">600km highway operational 2025</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Iran</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">[[kazakhstan-toll|Kazakhstan]]</td>
<td>1,148 km</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Electronic toll collection</td>
<td>Sarakhs, Gaudan</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Rapidly expanding</td>
<td>Daytime only</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">10,100km operational 2025</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Uzbekistan</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">[[uzbekistan-toll|Uzbekistan]]</td>
<td>1,793 km</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Planned toll roads</td>
<td>Farap, Dashoguz</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Development phase</td>
<td>Daytime only</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Major projects planned</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Afghanistan</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Iran</td>
<td>804 km</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Limited toll system</td>
<td>Torghundi, Ymamnazar</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Operational</td>
<td>Daytime only</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Selected highways</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>
<td>Kazakhstan</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Afghanistan</td>
<td>413 km</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">No toll system</td>
<td>Garabogaz</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Free roads</td>
<td>Daytime only</td>
+
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Infrastructure developing</td>
 
</tr>
 
</tr>
 
</table>
 
</table>
 +
</div>
  
== Future Toll System Development ==
+
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Useful Links & Resources</h2>
  
=== Planned Features ===
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Regional Toll Systems:</strong></p>
* '''Electronic collection:''' RFID-based toll systems
+
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
* '''Commercial focus:''' Initial tolls for trucks and buses
+
<li>[[kazakhstan-toll|Kazakhstan Toll]] - Rapidly expanding electronic toll network</li>
* '''Speed optimization:''' Higher speed limits on toll roads
+
<li>[[uzbekistan-toll|Uzbekistan Toll]] - Planned toll road development</li>
* '''International integration:''' Compatible with regional systems
+
<li>[[iran-toll|Iran Toll]] - Limited highway toll system</li>
 +
<li>[[afghanistan-toll|Afghanistan Toll]] - Currently toll-free infrastructure</li>
 +
</ul>
  
=== Timeline Expectations ===
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Central Asian Transport:</strong></p>
* '''2025:''' Completion of major highway sections
+
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
* '''2026-2027:''' Introduction of toll collection systems
+
<li>[[tajikistan-toll|Tajikistan Toll]] - Regional connectivity projects</li>
* '''Post-2027:''' Expansion to additional routes
+
<li>[[kyrgyzstan-toll|Kyrgyzstan Toll]] - Mountain highway infrastructure</li>
* '''Integration:''' Regional transport corridor development
+
<li>[[georgia-toll|Georgia Toll]] - Caucasus transportation links</li>
 +
<li>[[azerbaijan-toll|Azerbaijan Toll]] - Caspian Sea region connectivity</li>
 +
</ul>
  
== Frequently Asked Questions ==
+
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Official Information:</strong></p>
 +
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
 +
<li>Türkmen Awtoban CJSC - Highway construction and toll operations</li>
 +
<li>Government of Turkmenistan - Transport policy and regulations</li>
 +
<li>Embassy contacts - Visa and transit permit information</li>
 +
<li>Border crossing schedules - Daytime operation hours</li>
 +
</ul>
  
=== Are there currently any toll roads in Turkmenistan? ===
+
</div>
No, as of 2025, Turkmenistan has no operational toll roads. All current highways and roads are free to use.
 
  
=== When will toll roads start operating? ===
+
<div class="shadowCard">
The first toll roads are expected to become operational between 2025-2027, starting with the Ashgabat-Turkmenabat highway.
+
<h3 style="color: #202122; margin: 0 0 10px 0; font-size: 18px; font-family: Georgia, 'Times New Roman', serif; text-align: center;">Found outdated content or toll information? Join us to keep toll information accurate.</h3>
 
+
<div style="margin: 15px 0; text-align: center;">
=== Will all vehicles need to pay tolls? ===
+
<html>
Initially, tolls are planned primarily for commercial vehicles (trucks and buses). Passenger car tolls may be introduced later.
+
<a href="https://tollguru.com/contact"><button class="custom-button button-orange" style="margin-right: 10px;" type="button">Report Issue</button></a>
 
+
<a href="https://tollguru.com/toll-wiki/index.php?title=Special:CreateAccount&returnto=home-page"><button class="custom-button button-orange" type="button">Join Contributors</button></a>
=== How will the toll system work? ===
+
</html>
The planned system will use electronic toll collection with RFID technology, similar to systems in neighboring countries.
+
</div>
 
 
=== Can I travel across Turkmenistan without paying tolls? ===
 
Yes, currently all roads are toll-free, and alternative free routes will remain available even after toll roads are introduced.
 
 
 
=== What documents do I need to drive in Turkmenistan? ===
 
You need a valid international driving permit, vehicle registration, insurance, and appropriate visas for international visitors.
 
 
 
=== Are there any restrictions on road travel? ===
 
Some routes may require transit permits, and all border crossings operate during daytime hours only.
 
 
 
== Common Information for Travelers ==
 
 
 
* '''Current road access:''' All roads completely free of tolls
 
* '''Border procedures:''' Visa and documentation checks required
 
* '''Fuel availability:''' Widely available at subsidized prices
 
* '''Alternative transport:''' Railway and air connections available
 
* '''Language:''' Turkmen and Russian widely spoken
 
* '''Currency:''' Turkmen Manat (official exchange rates controlled)
 
* '''Navigation:''' GPS systems may have limited coverage in remote areas
 
 
 
== Investment & Development ==
 
 
 
=== Infrastructure Projects ===
 
* '''Private investment:''' $2.3 billion Ashgabat-Turkmenabat project
 
* '''Government support:''' Central Bank financing at 1% interest
 
* '''International routes:''' Part of Belt and Road Initiative
 
* '''Regional integration:''' Enhanced connectivity with Central Asia
 
 
 
=== Economic Impact ===
 
* '''Trade facilitation:''' Improved logistics for oil and gas exports
 
* '''Regional connectivity:''' Enhanced links to China, Iran, and Europe
 
* '''Transit revenue:''' Future income from international freight
 
* '''Infrastructure development:''' Modernization of transport networks
 
 
 
== Useful Links & Resources ==
 
 
 
* '''Government Transport Ministry:''' Limited public information available
 
* '''Border crossing info:''' Contact embassies for current requirements
 
* '''Visa information:''' Available through diplomatic missions
 
* '''Travel advisories:''' Check with relevant government travel departments
 
 
 
<div style="text-align: center; margin: 30px 0;">
 
[https://tollguru.com/toll-calculator-turkmenistan Calculate Your Turkmenistan Toll Cost]
 
 
</div>
 
</div>
  
 
</div>
 
</div>

Latest revision as of 17:24, 4 July 2025



Click on the map to open toll wiki for a country/state

Turkmenistan Toll Roads 2025: Complete Highway Guide

System: Planned electronic toll collection (operational 2025-2027)
Operator: Türkmen Awtoban CJSC
Currency: Turkmen Manat (TMT)
Technology: Electronic toll collection with video surveillance
Coverage: Toll rates range from 0.35 to 0.45 Turkmen manats per kilometer (operational sections only)

Do I Need to Pay Tolls in Turkmenistan? 2025 Update

Currently, most roads in Turkmenistan are toll-free, but this is changing rapidly. The Ashgabat-Turkmenabat highway sections are now operational with toll collection, while the final Mary-Turkmenabat section completion is scheduled for 2025.

Key Reality: The Ashgabat-Turkmenabat and Ashgabat-Turkmenbashi highways will be toll roads, with initially only heavy vehicles engaged in commercial transportation required to pay.

2025 Status: The Mary-Turkmenabat section construction and commissioning is being completed in 2025, making the 600-kilometer Ashgabat-Turkmenabat highway fully operational with electronic toll collection.

Turkmenistan Toll Costs: Current Rates

Turkmenistan operates a distance-based toll system on its modern highways, with rates varying by vehicle type and route section.

Current Toll Rates by Vehicle Class (2025)

Vehicle Type Rate per km (TMT) USD Equivalent Status
Passenger Cars 0.35-0.45 $0.10-0.13 Operational on completed sections
Commercial Vehicles Higher rates (TBD) TBD Primary toll target
Heavy Trucks Premium rates TBD Full implementation planned

Operational Toll Highways (2025)

Highway Section Length Status Opening Date
Ashgabat-Tejen 203 km Operational October 2021
Tejen-Mary 109 km Operational April 2024
Mary-Turkmenabat 288 km Completion 2025 End 2025

How to Pay Turkmenistan Tolls

Turkmenistan's toll system features modern electronic payment methods with automatic vehicle detection and surveillance systems.

Electronic Payment System:

  • Payment terminals providing electronic payments located at highway intersections
  • Traffic controlled by automatic system using continuous video surveillance
  • License plate recognition for toll collection
  • Prepaid accounts and electronic payment options

Highway Features:

  • Eight lanes total (three main lanes plus one auxiliary lane each direction)
  • Total road width of 34.5 meters
  • Speed limits up to 130 km/h on toll highways
  • Traffic control services and recreation areas at payment terminals

To calculate toll costs for all vehicle types across Turkmenistan toll roads, use TollGuru Turkmenistan toll calculator

Recent Changes (2025)

Major Infrastructure Completion:

  • Mary-Turkmenabat section construction and commissioning being completed in 2025
  • Full 600-kilometer Ashgabat-Turkmenabat motorway nearing completion
  • New Ashgabat-Turkmenbashi highway segment construction launching in 2026

Toll System Implementation:

  • Electronic toll collection operational with distance-based rates
  • Commercial vehicles initially targeted for toll collection
  • Full toll implementation across all vehicle types planned for 2025-2027

International Connectivity:

  • Discussions underway with international financial institutions for railway modernization
  • Highway designed to provide freight trucks direct access to Turkmenbashi International Seaport
  • Enhanced connectivity to Caucasus, Europe, Iran, and Persian Gulf regions

Planning Your Journey

Cost Considerations:

  • Ashgabat-Turkmenabat full journey: ~$30-40 for passenger cars (600km)
  • Commercial vehicles: Premium rates apply
  • Alternative free roads: Available but significantly slower
  • International transit: Competitive with regional routes

Travel Requirements:

  • Visa required for most international visitors
  • Transit permits needed for some routes
  • International driving permit recommended
  • Border crossings operate daytime hours only

Frequently Asked Questions

Are there currently toll roads in Turkmenistan?

Yes, sections of the Ashgabat-Turkmenabat highway are operational with electronic toll collection. The full 600km route will be completed by end 2025.

What vehicles need to pay tolls?

Currently, all vehicle types pay tolls on operational highway sections. Commercial vehicles were initially the primary target but the system now includes passenger cars.

Can I avoid tolls in Turkmenistan?

Yes, alternative free roads remain available, but toll highways offer significantly faster travel times with speeds up to 130 km/h.

How much does it cost to drive across Turkmenistan?

The full Ashgabat-Turkmenabat journey (600km) costs approximately $30-40 for passenger cars, with commercial vehicles paying premium rates.

Do I need special documents for Turkmenistan toll roads?

International visitors need valid visas, international driving permits, and vehicle documentation. Some routes may require transit permits.

Turkmenistan vs. Neighboring Countries

Country System Type Current Status Coverage
Turkmenistan Electronic toll collection Operational/Expanding 600km highway operational 2025
Kazakhstan Electronic toll collection Rapidly expanding 10,100km operational 2025
Uzbekistan Planned toll roads Development phase Major projects planned
Iran Limited toll system Operational Selected highways
Afghanistan No toll system Free roads Infrastructure developing

Useful Links & Resources

Regional Toll Systems:

Central Asian Transport:

Official Information:

  • Türkmen Awtoban CJSC - Highway construction and toll operations
  • Government of Turkmenistan - Transport policy and regulations
  • Embassy contacts - Visa and transit permit information
  • Border crossing schedules - Daytime operation hours

Found outdated content or toll information? Join us to keep toll information accurate.

Cookies help us deliver our services. By using our services, you agree to our use of cookies.