bihar-toll-roads: Difference between revisions

From Toll Wiki

No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{DISPLAYTITLE: Bihar Toll Roads Complete Guide: FASTag, Rates & Payment 2025}}
{{DISPLAYTITLE: Bihar Toll Roads Complete Guide: FASTag, Rates and Payment 2026}}
{{#seo:|title=Bihar Toll Roads Complete Guide: FASTag, Rates & Payment 2025}}
{{#seo:|title=Bihar Toll Roads Complete Guide: FASTag, Rates and Payment 2026}}
{{#seo:|keywords=Bihar tolls, FASTag, NHAI toll plazas, NH-19, NH-57, NH-83, toll calculator}}
{{#seo:|keywords=Bihar tolls, FASTag Bihar, NH-19 Bihar toll, Grand Trunk Road toll, Mohania toll plaza, Sasaram toll, Deederganj toll plaza, Patna toll, NHAI Bihar, toll calculator Bihar}}
{{#seo:|description=Complete 2025 guide to Bihar toll roads, FASTag requirements, current rates, payment methods for NH-19, NH-57, NH-83. Calculate tolls now.}}
{{#seo:|description=2026 guide to Bihar toll roads: FASTag rules, NHAI plaza rates, payment methods, penalties and new expressways. Calculate your toll now.}}
{{#canonics: https://tollguru.com/toll-wiki/bihar-toll-roads}}
{{#canonics: https://tollguru.com/bihar-toll-roads}}
{{worldMap}}
{{worldMap}}


Line 13: Line 13:
<div style="background: #ffffff; border: 1px solid #dee2e6; border-radius: 8px; padding: 20px; padding-bottom:0">
<div style="background: #ffffff; border: 1px solid #dee2e6; border-radius: 8px; padding: 20px; padding-bottom:0">
<div style="color: #202122; font-size: 16px; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6;">
<div style="color: #202122; font-size: 16px; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6;">
<strong style="font-weight: bold;">System:</strong> NHAI Electronic toll collection (FASTag) + Cash payment<br>
<strong style="font-weight: bold;">System:</strong> FASTag electronic toll collection (mandatory) + UPI as fallback; cash lanes being phased out<br>
<strong style="font-weight: bold;">Coverage:</strong> National Highways NH-19, NH-57, NH-83, state highways and expressways<br>
<strong style="font-weight: bold;">Coverage:</strong> National Highways NH-19 (Grand Trunk Road, old NH-2), NH-27 (Muzaffarpur-Purnia, old NH-57), NH-31 (Khagaria-Purnea), NH-30 (Patna-Bakhtiyarpur), NH-83 (Patna-Gaya), NH-22 (Muzaffarpur-Sonbarsa), NH-80 (Mokama-Munger-Bhagalpur), NH-922 (Koilwar-Buxar) and BSRDC state highways and bridges<br>
<strong style="font-weight: bold;">Currency:</strong> Indian Rupee (₹)<br>
<strong style="font-weight: bold;">Currency:</strong> Indian Rupee (INR)<br>
<strong style="font-weight: bold;">Technology:</strong> FASTag RFID transponders, Manual cash collection, ANPR cameras<br>
<strong style="font-weight: bold;">Technology:</strong> FASTag RFID transponders, ANPR cameras, e-notice enforcement linked to VAHAN, GNSS tolling being phased in<br>
<strong style="font-weight: bold;">Operators:</strong> NHAI, Bihar State Road Development Corporation, Private concessionaires
<strong style="font-weight: bold;">Operators:</strong> National Highways Authority of India (NHAI), Bihar State Road Development Corporation (BSRDC), Bihar Road Construction Department, Private concessionaires
</div>
</div>
</div>
</div>


<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Do I Need FASTag for Bihar? 2025 Update</h2>
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Do I Need FASTag for Bihar? 2026 Update</h2>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">No, you don't need FASTag to drive on Bihar toll roads - but you'll save time and get seamless passage with one. Bihar operates both electronic toll collection through FASTag and traditional cash payment systems across its National Highways.</p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Yes - FASTag is mandatory for all Class M and N vehicles on national highways in Bihar, as it is across India since February 15, 2021. A vehicle without a valid, active tag pays 1.25x the standard toll through UPI, or 2x where cash is still accepted. Under the MoRTH "Zero-Cash" direction, dedicated cash lanes are being phased out at national highway plazas, so a working FASTag is the only way to pay the standard rate.</p>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;"><strong style="font-weight: bold;">Key Reality:</strong> FASTag users enjoy priority lanes and faster processing at toll plazas. Cash payments are still widely accepted but may involve longer queues, especially during peak travel times on major routes like NH-19 and NH-57.</p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;"><strong style="font-weight: bold;">Key Reality:</strong> Bihar sits on the Grand Trunk Road (NH-19), one of India's busiest freight and passenger corridors connecting Uttar Pradesh to Jharkhand and West Bengal. In Bihar the road runs from the Uttar Pradesh border through Daffi, Mohania and Sasaram to Saukala near Aurangabad before entering Jharkhand. Long-distance travellers and commercial truckers on this route pass through multiple plazas. FASTag eliminates queue time and ensures the correct rate is charged automatically. Two-wheelers are exempt from toll at national highway fee plazas.</p>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;"><strong style="font-weight: bold;">2025 Update:</strong> Bihar is rapidly expanding its expressway network with ambitious projects including the Raxaul-Haldia Expressway, Gorakhpur-Siliguri corridor, and the completed Loknayak Ganga Path (Patna Marine Drive). New toll policy 2025 planning GNSS-based distance charging.</p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;"><strong style="font-weight: bold;">2026 Update:</strong> NHAI revised national highway toll rates on April 1, 2026 under the annual WPI-indexed revision. The FASTag Annual Pass was revised to Rs 3,075 for FY 2026-27, covering 200 crossings or one year at national highway and expressway fee plazas for non-commercial private vehicles. A MoRTH "Zero-Cash" policy direction from April 10, 2026 is progressively eliminating dedicated cash lanes at national highway plazas in favour of fully cashless FASTag/UPI operations. In July 2026 Bihar also notified the Bihar Road User Fee Rules, 2026, a framework for per-kilometre tolling on selected state highways, major bridges, bypasses and tunnels.</p>


<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Bihar Toll Costs: Current Rates</h2>
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Bihar Toll Costs: Current Rates</h2>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Bihar operates toll collection on multiple National Highways with rates varying by vehicle classification, route, and payment method. All rates are revised annually on April 1st as per NHAI guidelines.</p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Bihar follows the NHAI national rate structure, revised annually on April 1 under the National Highways Fee (Determination of Rates and Collection) Rules, 2008. Rates vary by plaza based on tollable length, road category (BOT or public-funded), and concessionaire. The table below shows FY 2026-27 rates (effective April 1, 2026) for the highest-traffic plazas.</p>


<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 20px 0 10px 0;">Current Toll Rates by Vehicle Class (2025)</h3>
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 20px 0 10px 0;">Plaza-Specific Rates (Effective April 1, 2026)</h3>


<div style="overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 20px 0;">
<div style="overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 20px 0;">
<table class="toll-table">
<table style="width: 100%; min-width: 600px; border-collapse: collapse; font-size: 16px; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; color: #202122; outline: 1px solid #dee2e6;">
<tr>
<tr>
<th>Vehicle Type</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Toll Plaza</th>
<th>Classification</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Highway / District</th>
<th>Typical Range (₹)</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Car/Jeep/Van</th>
<th>Example Routes</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">LCV/Mini-Bus</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Bus/2-Axle Truck</th>
</tr>
</tr>
<tr>
<tr>
<td>Car/Jeep/Van (up to 3.2m height)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Mohania</td>
<td>Category M/Car</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-19 (old NH-2), Kaimur – Varanasi-Aurangabad stretch (42.6 km)</td>
<td>₹35-85</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 65</td>
<td>Saukala (NH-19), Maithi (NH-57)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 105</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 225</td>
</tr>
</tr>
<tr>
<tr>
<td>Light Commercial Vehicle</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Sasaram</td>
<td>Category LCV</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-19 (old NH-2), Rohtas – Varanasi-Aurangabad stretch (94.8 km)</td>
<td>₹55-130</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Rs 150</td>
<td>Goods carriers up to 7.5 tonnes</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Rs 240</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Rs 500</td>
</tr>
</tr>
<tr>
<tr>
<td>2-Axle Bus/Truck</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Deederganj</td>
<td>Category Bus/2 Axle</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-30, Patna – Patna-Bakhtiyarpur stretch (46.8 km)</td>
<td>₹115-270</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 140</td>
<td>Regular bus and medium truck services</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 215</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 435</td>
</tr>
</tr>
<tr>
<tr>
<td>3-Axle Commercial Vehicle</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Maranga</td>
<td>Category 3 Axle</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-31, Purnia – Khagaria-Purnea stretch (70 km)</td>
<td>₹170-400</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Rs 75</td>
<td>Heavy goods vehicles</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Rs 120</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Rs 255</td>
</tr>
</tr>
<tr>
<tr>
<td>Multi-Axle Vehicle (4+ axles)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Kharik</td>
<td>Category MAV</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-31, Bhagalpur – Khagaria-Purnea stretch (70 km)</td>
<td>₹225-530</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 65</td>
<td>Heavy construction, oversized vehicles</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 100</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 215</td>
</tr>
</table>
</div>
 
<p style="font-size: 14px; color: #6c757d; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;"><em>Single-journey fees for FY 2026-27, effective April 1, 2026 (next revision due March 31, 2027), as published on the NHAI Toll Information System. Return fares, monthly passes and other vehicle classes are on each plaza notice; use the TollGuru calculator for exact route figures. Without a valid FASTag: 1.25x through UPI, or 2x where cash is still accepted.</em></p>
 
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 20px 0 10px 0;">Other NHAI Toll Plazas in Bihar</h3>
 
<div style="overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 20px 0;">
<table style="width: 100%; min-width: 600px; border-collapse: collapse; font-size: 16px; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; color: #202122; outline: 1px solid #dee2e6;">
<tr>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Toll Plaza</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Highway / Chainage</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Stretch</th>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Daffi</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-19, Km 800</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Varanasi-Aurangabad</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Saukala</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-19, Km 200.1</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Aurangabad-Barachatti</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Devkuli</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-83</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Patna-Gaya-Dobhi</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Jindapur</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-83</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Patna-Gaya-Dobhi</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Biharibigha</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-31</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Bakhtiyarpur-Mokama</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Karigawan</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-20</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Rajauli-Bakhtiyarpur</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Paithna</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-20</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Bakhtiyarpur-Rajauli</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Barhima</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-27</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">UP Border-Kotwa</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Parsoni Khem</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-27</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Kotwa-Mehsi-Muzaffarpur</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Maithi</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-27, Km 26.2</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Muzaffarpur-Darbhanga</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Raje (Old Naraur)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-27, Km 88.0</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Darbhanga-Asanpur</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Asanpur</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-27, Km 150.4</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Asanpur-Forbesganj</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Hariabara</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-27, Km 244.9</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Forbesganj-Purnea</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Barsoni</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-27, Km 416.0</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Purnea-Dalkola</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Shahpur</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-31, Km 232.6</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Simaria-Khagaria</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Balgudar</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-80, Km 23.5</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Mokama-Munger</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Jichho (Bhagalpur Bypass)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-80</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Bhagalpur Bypass</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Toda</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-82, Km 128</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Bihar Sharif-Barbigha-Mokama</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Mahanth Maniyari</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-122</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Muzaffarpur-Barsoni</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Saidpur Patedha</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-22</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Hajipur-Muzaffarpur</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Runni Saidpur</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-22, Km 28.9</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Muzaffarpur-Sonbarsa</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Kulhariya</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">NH-922</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Koilwar-Bhojpur</td>
</tr>
</tr>
<tr>
<tr>
<td>Earth Moving Vehicle</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Dalsagar</td>
<td>Category EMV</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-922</td>
<td>₹225-530</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Bhojpur-Buxar</td>
<td>Construction machinery</td>
</tr>
</tr>
</table>
</table>
</div>
</div>


<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 20px 0 10px 0;">Major Toll Plazas in Bihar (2025)</h3>
<p style="font-size: 14px; color: #6c757d; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;"><em>Plaza names, highway numbers and chainage follow the NHAI Toll Information System list. Gazette-notified rates for each plaza are published on TIS. At Kulhariya (NH-922) the car toll rose from Rs 105 to Rs 110 on August 1, 2026 after a change of operator.</em></p>
 
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 20px 0 10px 0;">Multi-Axle Vehicle Rates at Mohania (April 2026)</h3>


<div style="overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 20px 0;">
<div style="overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 20px 0;">
<table class="toll-table">
<table style="width: 100%; min-width: 600px; border-collapse: collapse; font-size: 16px; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; color: #202122; outline: 1px solid #dee2e6;">
<tr>
<tr>
<th>Toll Plaza</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Vehicle Class</th>
<th>Highway</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Description</th>
<th>Location/Stretch</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Single-Trip Rate (Rs)</th>
<th>Status</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Without FASTag (2x)</th>
</tr>
</tr>
<tr>
<tr>
<td>Saukala</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Car/Jeep/Van</td>
<td>NH-19</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Light motor vehicle</td>
<td>Aurangabad-Barachatti (Km 180-240)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">65</td>
<td>Operational</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">130</td>
</tr>
</tr>
<tr>
<tr>
<td>Maithi (OMT)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">LCV/Mini-Bus</td>
<td>NH-57</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Light commercial vehicle, light goods vehicle or mini bus</td>
<td>Muzaffarpur-Darbhanga-Purnea (69.5 km)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">105</td>
<td>Operational</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">210</td>
</tr>
</tr>
<tr>
<tr>
<td>Patna Bypass</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">2-Axle Bus/Truck</td>
<td>NH-83</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Bus or truck (two axles)</td>
<td>Patna-Gaya corridor</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">225</td>
<td>Planned</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">450</td>
</tr>
</tr>
<tr>
<tr>
<td>Loknayak Ganga Path</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">3-Axle Vehicle</td>
<td>State Expressway</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Three-axle commercial vehicle</td>
<td>Digha-Deedarganj, Patna (20.5 km)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">350</td>
<td>Partially Operational</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">700</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">4-6 Axle / HCM-EME</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Heavy construction machinery, earth moving equipment or multi-axle vehicle (4 to 6 axles)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">350</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">700</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">7+ Axle Oversized</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Oversized vehicle (7 or more axles)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">430</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">860</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Two-Wheelers</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Motorcycles, scooters</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;"><strong style="font-weight: bold;">Exempt</strong> at national highway fee plazas</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">N/A</td>
</tr>
</tr>
</table>
</table>
</div>
</div>


<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 20px 0 10px 0;">Where You Pay Tolls in Bihar (2025)</h3>
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 20px 0 10px 0;">Pass and Discount Rates (FY 2026-27)</h3>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;"><strong style="font-weight: bold;">National Highway Network:</strong> NH-19 (Grand Trunk Road), NH-57 (Muzaffarpur-Purnia), NH-83 (Patna-Gaya), NH-22 (Patna-Mokameh), NH-527A</p>
<div style="overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 20px 0;">
<table style="width: 100%; min-width: 600px; border-collapse: collapse; font-size: 16px; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; color: #202122; outline: 1px solid #dee2e6;">
<tr>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Pass / Discount</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Rate</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Eligibility</th>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Return journey (within 24 hours)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">About 1.5x the single-trip rate (Mohania car: Rs 65 single, Rs 100 return); exact figure per plaza notice</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">All FASTag vehicles</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Local monthly pass (20 km radius)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Reduced rate, varies by plaza (Rs 350 at Mohania, Sasaram, Maranga and Kharik; Rs 360 at Deederganj for FY 2026-27)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Non-commercial vehicles registered within 20 km of the plaza</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">FASTag Annual Pass (FY 2026-27)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 3,075 one-time (200 crossings or 1 year)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Non-commercial private vehicles (car, jeep, van) with a valid FASTag at national highway and expressway fee plazas; state-managed stretches are charged separately</td>
</tr>
<tr>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">UPI payment (no FASTag)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">1.25x standard rate</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Vehicles without FASTag at plazas with UPI-enabled lanes</td>
</tr>
</table>
</div>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;"><strong style="font-weight: bold;">State Expressways:</strong> Loknayak Ganga Path (Patna Marine Drive), upcoming Raxaul-Haldia corridor</p>
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">How to Pay Bihar Tolls</h2>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;"><strong style="font-weight: bold;">Future Projects:</strong> Gorakhpur-Siliguri Expressway, Buxar-Bhagalpur Expressway, Patna Outer Ring Road (140 km)</p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">The following payment methods are available at Bihar toll plazas:</p>


<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">How to Pay Bihar Tolls</h2>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">1. FASTag (Recommended)</strong></p>
 
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">You can use the following toll payment methods to pay tolls in Bihar:</p>
<li>RFID sticker affixed to windscreen; deducted automatically at each boom barrier</li>
<li>Available from authorised issuer banks, NHAI/IHMCL channels, and online via issuing bank apps</li>
<li>Tag price, security deposit and minimum recharge vary by issuing bank; confirm with the bank before purchase</li>
<li>Works at all 1,150+ NHAI plazas nationwide; a FASTag from any Indian state works at all Bihar plazas</li>
<li>Maintain at least Rs 500 buffer above estimated trip cost to avoid blacklisting mid-route</li>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">1. FASTag Electronic System:</strong></p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">2. NHAI Apps and Helpline</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>Works on all Bihar toll plazas and nationwide on NHAI roads</li>
<li>Rajmargyatra (official NHAI/IHMCL app and web portal at [https://rajmargyatra.nhai.gov.in Rajmargyatra]: FASTag account management, balance top-up, Annual Pass purchase, transaction history, plaza-wise rates along a route, plaza complaint submission</li>
<li>Available from banks: SBI, HDFC, ICICI, Axis, PNB, and 32+ issuers</li>
<li>My FASTag app: wallet recharge and tag status check</li>
<li>Automatic deduction from linked account or prepaid wallet</li>
<li>NHAI helpline: 1033 (24x7, toll-free) for emergencies, plaza complaints, and FASTag issues</li>
<li>Priority lanes with faster processing</li>
</ul>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">2. Cash Payment:</strong></p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">3. UPI and Cash (Fallback)</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>Accepted at all toll plazas in Bihar</li>
<li>Dedicated cash lanes are being eliminated at national highway plazas under the MoRTH Zero-Cash direction from April 10, 2026; follow lane signage at the plaza</li>
<li>Manual toll booths with operators</li>
<li>UPI is accepted at plazas with UPI-enabled lanes at 1.25x the standard rate</li>
<li>Exact change recommended to avoid delays</li>
<li>Where cash is still accepted, a vehicle without a valid FASTag pays 2x the standard rate</li>
<li>Same rates as FASTag for most plazas</li>
</ul>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">3. Digital Payment Options:</strong></p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">4. GNSS-Based Tolling (Pilot)</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>UPI payments at select modern toll plazas</li>
<li>GNSS-based tolling is being introduced in phases across India; FASTag continues alongside during the transition</li>
<li>Credit/Debit cards where available</li>
<li>NHAI is moving toward barrier-free Multi-Lane Free Flow (MLFF) tolling; the Mokama-Munger expressway section approved in September 2025 is designed with close tolling</li>
<li>Mobile wallets at newer facilities</li>
</ul>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;">To calculate toll costs for cars, trucks, motorcycles and all vehicle types across Bihar toll roads, use TollGuru Bihar toll calculator</p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;">To calculate toll costs for cars, trucks, motorcycles and all vehicle types on Bihar routes, use the TollGuru Bihar toll calculator:</p>


<div style="text-align: center; margin: 20px 0;">
<div style="text-align: center; margin: 20px 0;">
Line 162: Line 341:
</div>
</div>


<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Recent Changes (2025)</h2>
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Bihar State Highway and Bridge Tolls</h2>
 
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Until 2026, toll collection in Bihar was limited to national highways. The Bihar Road User Fee Rules, 2026 introduce a framework for per-kilometre user fees on selected state highways, major bridges, bypasses and tunnels, with FASTag as the main payment mode. Rates depend on vehicle class and road width.</p>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Infrastructure Development:</strong></p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Key Points:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>Loknayak Ganga Path (Patna Marine Drive) final phase operational April 2025</li>
<li>State highways narrower than 5.5 metres and sections inside municipal areas are not tolled</li>
<li>Six-lane Ganga Bridge at Aunta-Simarai completed February 2025</li>
<li>Non-payment attracts a penalty of three times the applicable toll</li>
<li>Ashok Rajpath double-decker flyover construction ongoing</li>
<li>Private non-commercial vehicles have been announced as exempt on state highways; commercial vehicles pay per-kilometre rates</li>
<li>DPRs approved for Gorakhpur-Siliguri and Raxaul-Haldia expressways</li>
<li>The FASTag Annual Pass applies to national highway and expressway fee plazas only; state-managed stretches are charged separately</li>
<li>The list of tolled sections is notified by the Road Construction Department; check its notifications before travel</li>
</ul>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Toll Rate Revisions:</strong></p>
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Enforcement and Penalties</h2>
 
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">NHAI enforces toll compliance at Bihar plazas through RFID readers, ANPR cameras, and a national e-notice system active from March 2026. NH-19 plazas are among the busiest on the network and see active enforcement given the high freight traffic on the Grand Trunk Road corridor.</p>
 
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Key Penalty Rules:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>Annual revision effective April 1, 2025 across all NHAI toll plazas</li>
<li><strong style="font-weight: bold;">FASTag lane violation:</strong> 2x the standard toll rate charged immediately</li>
<li>Maithi toll plaza (NH-57) rates updated for 69.5 km Muzaffarpur-Darbhanga-Purnea section</li>
<li><strong style="font-weight: bold;">FASTag blacklisting:</strong> Triggered by insufficient balance, expired KYC, or vehicle registration mismatch. NPCI rules allow a short window around the plaza read time to fix an inactive or low-balance tag before a penalty applies, so recharge immediately if you are warned</li>
<li>Monthly pass rates revised for local residents within 20 km radius</li>
<li><strong style="font-weight: bold;">Tag misuse:</strong> Using one FASTag for multiple vehicles, or holding the tag by hand instead of affixing it to the windscreen, results in tag deactivation</li>
<li><strong style="font-weight: bold;">E-notice system (from March 17, 2026):</strong> Unpaid tolls recorded by FASTag readers and ANPR cameras trigger an SMS/email e-notice to the registered owner. Paying the original toll within 72 hours avoids the penalty; after that the unpaid fee is 2x. A representation can be filed within 72 hours and must be decided within 5 days. If dues stay unpaid beyond 15 days with no representation pending, they are recorded in VAHAN and vehicle-related services can be restricted</li>
<li><strong style="font-weight: bold;">100-metre / 10-second rule:</strong> If a queue at a plaza exceeds 100 metres or per-vehicle service time exceeds 10 seconds, vehicles may pass toll-free until congestion clears (plaza discretion)</li>
</ul>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Technology Improvements:</strong></p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Exempt Vehicles:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>New toll policy 2025 planning GNSS-based distance charging to replace fixed toll plazas</li>
<li>Presidential, Governor and Vice-Presidential convoys</li>
<li>Enhanced FASTag interoperability across all Bihar highways</li>
<li>Armed Forces, paramilitary, and fire service vehicles on duty</li>
<li>Digital payment integration at major toll facilities</li>
<li>Ambulances and medical emergency vehicles</li>
<li>Other categories listed in Rule 11 of the National Highways Fee Rules, 2008 (confirm through NHAI exemption queries)</li>
<li>Two-wheelers at national highway fee plazas</li>
</ul>
</ul>


<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Regional Toll Information</h2>
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Recent Changes (2026)</h2>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">North Bihar - Agricultural and Trade Corridor:</strong></p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">March 17, 2026 - E-Notice System:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>[[uttar-pradesh-toll-road|Uttar Pradesh Toll]] - Connected via NH-19 Grand Trunk Road system</li>
<li>NHAI introduced the e-notice system for unpaid toll through the National Highways Fee (Second Amendment) Rules, 2026; pay the original toll within 72 hours to avoid the 2x unpaid fee, with unpaid dues recorded in VAHAN after 15 days</li>
<li>Muzaffarpur-Darbhanga-Purnea corridor (NH-57) with Maithi toll plaza</li>
<li>Patna-Hajipur-Muzaffarpur section development ongoing</li>
<li>Planned Raxaul-Haldia Expressway for Nepal trade connectivity</li>
</ul>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Central Bihar - Patna Metropolitan Region:</strong></p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">April 1, 2026 - National Rate Revision:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>Loknayak Ganga Path (Patna Marine Drive) - 20.5 km toll expressway operational</li>
<li>WPI-indexed annual revision applied across all NHAI plazas in Bihar; rates at individual plazas are gazette-notified by concessionaire</li>
<li>Patna Outer Ring Road - 140 km project worth ₹4,800 crore under planning</li>
<li>FASTag Annual Pass revised from Rs 3,000 to Rs 3,075 for FY 2026-27; valid for 200 crossings or one year</li>
<li>NH-83 Patna-Gaya corridor with planned toll infrastructure</li>
<li>Deederganj (NH-30) rates rose by 3.7% to 7.7% and the local monthly pass rose from Rs 340 to Rs 360</li>
<li>Six-lane Ganga Bridge connectivity enhancing regional access</li>
</ul>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">South Bihar - Mining and Industrial Belt:</strong></p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">April 10, 2026 - MoRTH Zero-Cash Policy:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>NH-19 Aurangabad-Barachatti section with Saukala toll plaza</li>
<li>MoRTH directed elimination of dedicated cash lanes at national highway plazas; Bihar plazas are transitioning to FASTag/UPI-only operations progressively</li>
<li>[[jharkhand-toll-roads|Jharkhand Toll]] - Connected via Grand Trunk Road extension</li>
<li>Buxar-Bhagalpur Expressway planning for 350 km Greenfield project</li>
<li>Industrial corridor development along Ganga riverfront</li>
</ul>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">East Bihar - Border Trade and Connectivity:</strong></p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">July 2026 - Bihar Road User Fee Rules:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>[[west-bengal-toll-roads|West Bengal Toll]] - Connected via Farakka corridor</li>
<li>Bihar notified the Road User Fee Rules, 2026 for per-kilometre tolling on selected state highways, major bridges, bypasses and tunnels; private non-commercial vehicles are announced as exempt</li>
<li>Gorakhpur-Siliguri Expressway DPR under development</li>
<li>Purnia region connectivity through NH-57 extension</li>
<li>Cross-border trade facilitation infrastructure</li>
</ul>
</ul>


<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Planning Your Journey</h2>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">August 1, 2026 - NH-922 Kulhariya Plaza:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>Revised toll came into effect at Kulhariya on the Patna-Buxar road; the car toll rose from Rs 105 to Rs 110 under a new operator</li>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Cost Considerations:</strong></p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Major Infrastructure Projects (2026):</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li><strong>Patna to Delhi:</strong> ₹200-400 via NH-19 Grand Trunk Road</li>
<li>Patna-Purnea Expressway: Announced in Union Budget 2024 under the Purvodaya eastern development plan; expected to cut the Patna-Purnea journey from over six hours to about three</li>
<li><strong>Patna to Kolkata:</strong> ₹150-300 via NH-19 eastern corridor</li>
<li>Buxar-Bhagalpur Expressway: Also announced under Purvodaya; the Mokama-Munger four-lane section (82.4 km, Rs 4,447.38 crore) received Cabinet approval on September 10, 2025 on Hybrid Annuity Mode with close tolling; construction is expected to begin after the 2026 monsoon</li>
<li><strong>Local Bihar travel:</strong> ₹35-85 per toll plaza for cars</li>
<li>Varanasi-Ranchi-Kolkata Greenfield Expressway: Bihar section of about 170 km in seven packages across Kaimur, Rohtas, Aurangabad and Gaya; construction is underway on several stretches and a realignment near the Adhaura hills in Kaimur has been proposed</li>
<li><strong>Commercial vehicles:</strong> ₹115-530 depending on axle configuration</li>
<li>Raxaul-Haldia Six-Lane Expressway (Bharatmala): Runs from Raxaul on the Nepal border through East Champaran, Sheohar, Muzaffarpur, Samastipur, Begusarai, Lakhisarai, Munger and Banka, then through Jharkhand to Haldia Port; about 585 km in total with roughly 408 km in Bihar under the MoRTH-cleared alignment; land acquisition underway; expected to cut Raxaul-Haldia travel to under 10 hours</li>
<li>Gorakhpur-Siliguri Expressway (417 km, Bharatmala): Bihar section passes through West and East Champaran, Sheohar, Sitamarhi, Madhubani, Supaul, Araria and Kishanganj; land acquisition is under way and construction had not started as of August 2026</li>
<li>Amas-Darbhanga Expressway: Links south and north Bihar; construction underway in four packages and about 40% complete</li>
<li>J.P. Ganga Path extensions (BSRDC): The Digha-Sherpur-Koilwar extension and Ganga Path sections linking Munger, Sultanganj, Bhagalpur and Sabour were put out for bid on Hybrid Annuity Mode in 2025</li>
<li>Kacchi Dargah-Bidupur Bridge over the Ganga (9.76 km main bridge, Patna-Hajipur): Built by BSRDC; the first lane opened on June 23, 2025 and the full six-lane bridge was reported complete in 2026, pending formal commissioning</li>
</ul>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Travel Time Considerations:</strong></p>
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Planning Your Journey</h2>
 
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Major Corridor Tips:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li><strong>FASTag lanes:</strong> Faster processing, minimal stops</li>
<li>NH-19 (Grand Trunk Road, UP border to Jharkhand border): Bihar's busiest freight corridor; BOT plazas at Daffi, Mohania and Sasaram, followed by Saukala near Aurangabad. Heavy vehicle queues can be long at peak freight hours; FASTag is essential to avoid penalty rates and delays</li>
<li><strong>Cash lanes:</strong> Allow extra 5-10 minutes per toll plaza</li>
<li>NH-83 (Patna-Gaya-Bodh Gaya): Key pilgrimage and tourist route; Devkuli and Jindapur plazas serve the Patna-Gaya-Dobhi section</li>
<li><strong>Peak hours:</strong> 8-10 AM and 6-8 PM see heavier traffic</li>
<li>NH-30 (Patna-Bakhtiyarpur): Deederganj plaza on the four-lane Patna-Bakhtiyarpur stretch (46.8 km tollable length); all payments are collected electronically through FASTag</li>
<li><strong>Festival seasons:</strong> Diwali, Chhath Puja cause significant delays</li>
<li>NH-20 (Bakhtiyarpur-Rajauli): Karigawan plaza serves this section</li>
<li>NH-27 (Muzaffarpur-Darbhanga-Purnea, old NH-57): Important north Bihar agricultural corridor with Maithi, Raje, Asanpur, Hariabara and Barsoni plazas</li>
<li>NH-31 (Khagaria-Purnea/northeast Bihar): Shahpur, Kharik and Maranga plazas on this corridor serve the northeast Bihar agricultural and border trade corridor toward West Bengal</li>
</ul>
</ul>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Toll-Free Alternatives:</strong></p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Practical Tips:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li><strong>State highways:</strong> Available but significantly slower</li>
<li>Recharge FASTag before entering the NH-19 corridor; the Varanasi-Aurangabad-Dhanbad stretch has multiple consecutive plazas in Bihar and Jharkhand</li>
<li><strong>District roads:</strong> Free but often in poor condition</li>
<li>Return journey within 24 hours costs roughly 1.5x the single-trip rate rather than 2x; the exact return fare is on each plaza notice, so plan same-day round trips to save</li>
<li><strong>Old Grand Trunk Road:</strong> Some sections remain toll-free</li>
<li>The Rs 3,075 Annual Pass covers up to 200 plaza crossings or one year, whichever comes first, and pays for itself if your yearly toll bill would exceed Rs 3,075</li>
<li><strong>Rural routes:</strong> Scenic but add 1-3 hours to journey time</li>
<li>Monsoon flooding (June-September) can close low-lying NH sections in north Bihar; check NHAI advisories before travel in the Muzaffarpur, Darbhanga, and Supaul districts</li>
<li>Most state highways and district roads remain free of toll and are generally slower; selected state highways, bridges and bypasses can be tolled under the Bihar Road User Fee Rules, 2026, with private non-commercial vehicles announced as exempt</li>
</ul>
</ul>


<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Frequently Asked Questions</h2>
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Frequently Asked Questions</h2>


<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Can I avoid Bihar tolls completely?</h3>
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Can I avoid toll plazas in Bihar?</h3>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Yes, you can use state highways and district roads to avoid tolls, but this will significantly increase travel time. For example, avoiding NH-19 tolls between Patna and Sasaram can add 2-3 hours to your journey.</p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Yes, by using state highways and district roads, which are generally slower. National highways are considerably faster and better maintained, making the toll cost generally worthwhile. Selected state highways and bridges can charge a user fee under the Bihar Road User Fee Rules, 2026.</p>
 
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Do motorcycles pay tolls in Bihar?</h3>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Two-wheelers are exempt from toll charges at national highway fee plazas in Bihar. They can use dedicated two-wheeler lanes at toll plazas. This exemption applies to motorcycles and scooters.</p>


<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">What happens if I don't pay Bihar tolls?</h3>
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">What happens if my FASTag balance runs out on NH-19?</h3>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Bihar toll plazas primarily operate on immediate payment systems. Non-payment would result in being stopped at the plaza until payment is made. For FASTag users, insufficient balance triggers manual intervention.</p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Your tag can be rejected or blacklisted, and the vehicle is charged 2x (or 1.25x through UPI) at the plaza. NPCI rules allow a short window around the plaza read time to fix a low-balance or inactive tag before a penalty applies. Recharge via the Rajmargyatra app or your issuing bank app, or call NHAI helpline 1033. Given multiple consecutive plazas on NH-19, always maintain a Rs 500+ buffer.</p>


<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Do motorcycles pay tolls in Bihar?</h3>
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Is the FASTag Annual Pass worth it for Bihar travel?</h3>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">No, two-wheelers (motorcycles, scooters, bicycles) are generally exempt from toll payments on Bihar highways as per NHAI policy. They can use dedicated two-wheeler lanes at toll plazas.</p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">For non-commercial private vehicles that cross national highway fee plazas often, the Rs 3,075 annual pass is worth buying if your yearly toll would otherwise exceed that amount. It covers 200 crossings or one year, whichever comes first, at national highway and expressway fee plazas nationwide, not just in Bihar. State-managed stretches are charged separately.</p>


<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Is FASTag from other states valid in Bihar?</h3>
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Are toll rates the same at all Bihar plazas?</h3>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Yes, FASTag is interoperable across all Indian states. A FASTag issued in any state works at all Bihar toll plazas and throughout India's national highway network.</p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">No. Each plaza has gazette-notified rates based on its tollable length, road category (BOT concession or public-funded), and capital cost. Sasaram on NH-19 has a longer tollable stretch (94.8 km) than Mohania (42.6 km), so its rates are proportionally higher.</p>


<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Are there discounts for local residents?</h3>
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">When will the new Bihar expressways be tolled?</h3>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">Yes, local residents living within 20 km of toll plazas can get monthly passes at discounted rates. The discounted monthly pass rate varies by toll plaza and is typically 30-50% less than regular rates.</p>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 8px 0;">The Patna-Purnea and Buxar-Bhagalpur expressways were announced in Union Budget 2024 under the Purvodaya eastern development plan. The Raxaul-Haldia and Gorakhpur-Siliguri corridors are Bharatmala projects also running through Bihar. The Buxar-Bhagalpur Mokama-Munger section received Cabinet approval in September 2025 and construction was expected to begin after the 2026 monsoon. Toll collection begins on each section as it is handed over operationally, not at overall project completion.</p>


<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Bihar vs. Neighboring States</h2>
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Bihar vs. Neighbouring States and Countries</h2>


<div style="overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 20px 0;">
<div style="overflow-x: auto; -webkit-overflow-scrolling: touch; margin: 20px 0;">
<table class="toll-table">
<table style="width: 100%; min-width: 600px; border-collapse: collapse; font-size: 16px; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; color: #202122; outline: 1px solid #dee2e6;">
<thead>
<tr>
<tr>
<th>State</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">State / Country</th>
<th>System Type</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">System</th>
<th>Typical Cost</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Typical Car Rate</th>
<th>Coverage</th>
<th style="padding: 12px; outline: 1px solid #dee2e6; text-align: left; font-weight: bold; color: #ffffff !important; background: #555555 !important;">Key Feature</th>
</tr>
</tr>
</thead>
<tbody>
<tr>
<tr>
<td>Bihar</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Bihar</td>
<td>NHAI FASTag + Cash</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">FASTag RFID + UPI fallback; cash lanes being phased out</td>
<td>₹35-85 per plaza (cars)</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 65-150 per plaza</td>
<td>NH-19, NH-57, NH-83, expressways</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">NH-19 Grand Trunk Road corridor; multiple expressways under development</td>
</tr>
</tr>
<tr>
<tr>
<td>[[uttar-pradesh-toll-road|Uttar Pradesh]]</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">[https://tollguru.com/toll-wiki/india-toll India (National NHAI Network)]</td>
<td>NHAI + State expressways</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">FASTag RFID + GNSS pilot; 1,150+ plazas</td>
<td>₹40-120 per plaza</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Rs 50-215 per plaza</td>
<td>Extensive network, multiple expressways</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Annual pass Rs 3,075 for FY 2026-27; Zero-Cash policy April 2026</td>
</tr>
</tr>
<tr>
<tr>
<td>[[west-bengal-toll-roads|West Bengal]]</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Uttar Pradesh (western neighbour on NH-19)</td>
<td>NHAI + State toll</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">FASTag RFID + expressway tolling</td>
<td>₹30-75 per plaza</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Rs 70-200 per plaza</td>
<td>Limited to major highways</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Dense plaza network; Purvanchal and Agra-Lucknow Expressways active</td>
</tr>
</tr>
<tr>
<tr>
<td>[[jharkhand-toll-roads|Jharkhand]]</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Jharkhand (eastern neighbour on NH-19)</td>
<td>NHAI system</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">FASTag RFID</td>
<td>₹35-90 per plaza</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Rs 80-175 per plaza</td>
<td>NH-19, mining area roads</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #ffffff;">Dhanbad-Ranchi industrial corridor; same NHAI FASTag system as Bihar</td>
</tr>
</tr>
<tr>
<tr>
<td>[[nepal-toll|Nepal]]</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">[https://tollguru.com/toll-wiki/bangladesh-toll Bangladesh]</td>
<td>Manual collection</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Cash + electronic (mixed)</td>
<td>NPR 50-200 per checkpoint</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">BDT 50-200 per plaza</td>
<td>Border crossings, major highways</td>
<td style="padding: 12px; outline: 1px solid #dee2e6; background: #f5f7fa;">Expanding expressway network; Padma Bridge corridor active</td>
</tr>
</tr>
</tbody>
</table>
</table>
</div>
</div>


<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Useful Links & Resources</h2>
<h2 style="font-size: 24px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 25px 0 15px 0; border-bottom: 1px solid #a2a9b1; padding-bottom: 2px;">Official Resources</h2>


<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Internal Navigation:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>[[india-toll|India Toll]] - Complete national toll road information</li>
<li>[https://www.nhai.gov.in National Highways Authority of India (NHAI)] - Toll plaza locator, FASTag services, Annual Pass, exemption queries, helpline 1033</li>
<li>[[uttar-pradesh-toll-road|Uttar Pradesh Toll]] - Western neighbor toll information</li>
<li>[https://tis.nhai.gov.in NHAI Toll Information System (TIS)] - Plaza-specific gazette-notified rates and revision orders for all Bihar plazas</li>
<li>[[west-bengal-toll-roads|West Bengal Toll]] - Eastern neighbor toll systems</li>
<li>[https://rajmargyatra.nhai.gov.in Rajmargyatra (NHAI)] - Plaza-wise rates, FASTag Annual Pass, account and balance services</li>
<li>[[jharkhand-toll-roads|Jharkhand Toll]] - Southern neighbor mineral transport routes</li>
<li>[https://ihmcl.co.in Indian Highways Management Company Limited (IHMCL)] - FASTag issuer management, Rajmargyatra app, KYC verification</li>
<li>[[delhi-toll-roads|Delhi Toll]] - Capital region connectivity</li>
<li>[https://bsrdcl.bihar.gov.in Bihar State Road Development Corporation Limited (BSRDCL)] - State highway and bridge construction, J.P. Ganga Path extensions, Patna connectivity projects, tenders and notices</li>
<li>[[rajasthan-toll-roads|Rajasthan Toll]] - Western trade corridor</li>
<li>[https://state.bihar.gov.in Government of Bihar] - State transport policy, Road Construction Department notifications including the Bihar Road User Fee Rules, 2026</li>
</ul>
</ul>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Regional Information:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>[[maharashtra-toll-roads|Maharashtra Toll Roads]] - Industrial corridor reference</li>
<li>[[karnataka-toll-roads|Karnataka Toll Roads]] - Technology hub connectivity</li>
<li>[[tamil-nadu-toll-roads|Tamil Nadu Toll]] - Southern port access</li>
<li>[[gujarat-toll-roads|Gujarat Toll]] - Western manufacturing belt</li>
<li>[[punjab-toll-roads|Punjab Toll]] - Agricultural transport routes</li>
</ul>
<p style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 10px 0;"><strong style="font-weight: bold;">Official Contacts:</strong></p>
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
<li>NHAI Helpline: 1033 - 24×7 assistance for emergencies and complaints</li>
<li>Bihar Road Development: (0612) 2237-xxx - State highway information</li>
<li>FASTag Support: 1033 or bank-specific helplines</li>
<li>Emergency Services: 108, 1033 for road emergencies</li>
</ul>
<div style="text-align: center; margin: 30px 0;">
<html>
<a href="https://tollguru.com/bihar-toll-calculator"><button class="custom-button button-orange" type="button">Calculate Your Bihar Toll Cost</button></a>
</html>
</div>


</div>
</div>


<div class="shadowCard">
<div class="shadowCard">
<h3 style="color: #202122; margin: 0 0 10px 0; font-size: 18px; font-family: Georgia, 'Times New Roman', serif; text-align: center;">Found outdated content or toll information? Join us to keep toll information accurate.</h3>
<h3 style="font-size: 20px; font-weight: bold; color: #202122; font-family: Georgia, 'Times New Roman', serif; margin: 15px 0 8px 0;">Found outdated content or toll information? Join us to keep toll information accurate.</h3>
<div style="margin: 15px 0; text-align: center;">
<div style="margin: 15px 0; text-align: center;">
<html>
<html>
Line 355: Line 522:
</html>
</html>
</div>
</div>
</div>
</div>
</div>

Latest revision as of 14:43, 4 October 2026


Click on the map to open toll wiki for a country/state

Bihar Toll Roads Complete Guide

System: FASTag electronic toll collection (mandatory) + UPI as fallback; cash lanes being phased out
Coverage: National Highways NH-19 (Grand Trunk Road, old NH-2), NH-27 (Muzaffarpur-Purnia, old NH-57), NH-31 (Khagaria-Purnea), NH-30 (Patna-Bakhtiyarpur), NH-83 (Patna-Gaya), NH-22 (Muzaffarpur-Sonbarsa), NH-80 (Mokama-Munger-Bhagalpur), NH-922 (Koilwar-Buxar) and BSRDC state highways and bridges
Currency: Indian Rupee (INR)
Technology: FASTag RFID transponders, ANPR cameras, e-notice enforcement linked to VAHAN, GNSS tolling being phased in
Operators: National Highways Authority of India (NHAI), Bihar State Road Development Corporation (BSRDC), Bihar Road Construction Department, Private concessionaires

Do I Need FASTag for Bihar? 2026 Update

Yes - FASTag is mandatory for all Class M and N vehicles on national highways in Bihar, as it is across India since February 15, 2021. A vehicle without a valid, active tag pays 1.25x the standard toll through UPI, or 2x where cash is still accepted. Under the MoRTH "Zero-Cash" direction, dedicated cash lanes are being phased out at national highway plazas, so a working FASTag is the only way to pay the standard rate.

Key Reality: Bihar sits on the Grand Trunk Road (NH-19), one of India's busiest freight and passenger corridors connecting Uttar Pradesh to Jharkhand and West Bengal. In Bihar the road runs from the Uttar Pradesh border through Daffi, Mohania and Sasaram to Saukala near Aurangabad before entering Jharkhand. Long-distance travellers and commercial truckers on this route pass through multiple plazas. FASTag eliminates queue time and ensures the correct rate is charged automatically. Two-wheelers are exempt from toll at national highway fee plazas.

2026 Update: NHAI revised national highway toll rates on April 1, 2026 under the annual WPI-indexed revision. The FASTag Annual Pass was revised to Rs 3,075 for FY 2026-27, covering 200 crossings or one year at national highway and expressway fee plazas for non-commercial private vehicles. A MoRTH "Zero-Cash" policy direction from April 10, 2026 is progressively eliminating dedicated cash lanes at national highway plazas in favour of fully cashless FASTag/UPI operations. In July 2026 Bihar also notified the Bihar Road User Fee Rules, 2026, a framework for per-kilometre tolling on selected state highways, major bridges, bypasses and tunnels.

Bihar Toll Costs: Current Rates

Bihar follows the NHAI national rate structure, revised annually on April 1 under the National Highways Fee (Determination of Rates and Collection) Rules, 2008. Rates vary by plaza based on tollable length, road category (BOT or public-funded), and concessionaire. The table below shows FY 2026-27 rates (effective April 1, 2026) for the highest-traffic plazas.

Plaza-Specific Rates (Effective April 1, 2026)

Toll Plaza Highway / District Car/Jeep/Van LCV/Mini-Bus Bus/2-Axle Truck
Mohania NH-19 (old NH-2), Kaimur – Varanasi-Aurangabad stretch (42.6 km) Rs 65 Rs 105 Rs 225
Sasaram NH-19 (old NH-2), Rohtas – Varanasi-Aurangabad stretch (94.8 km) Rs 150 Rs 240 Rs 500
Deederganj NH-30, Patna – Patna-Bakhtiyarpur stretch (46.8 km) Rs 140 Rs 215 Rs 435
Maranga NH-31, Purnia – Khagaria-Purnea stretch (70 km) Rs 75 Rs 120 Rs 255
Kharik NH-31, Bhagalpur – Khagaria-Purnea stretch (70 km) Rs 65 Rs 100 Rs 215

Single-journey fees for FY 2026-27, effective April 1, 2026 (next revision due March 31, 2027), as published on the NHAI Toll Information System. Return fares, monthly passes and other vehicle classes are on each plaza notice; use the TollGuru calculator for exact route figures. Without a valid FASTag: 1.25x through UPI, or 2x where cash is still accepted.

Other NHAI Toll Plazas in Bihar

Toll Plaza Highway / Chainage Stretch
Daffi NH-19, Km 800 Varanasi-Aurangabad
Saukala NH-19, Km 200.1 Aurangabad-Barachatti
Devkuli NH-83 Patna-Gaya-Dobhi
Jindapur NH-83 Patna-Gaya-Dobhi
Biharibigha NH-31 Bakhtiyarpur-Mokama
Karigawan NH-20 Rajauli-Bakhtiyarpur
Paithna NH-20 Bakhtiyarpur-Rajauli
Barhima NH-27 UP Border-Kotwa
Parsoni Khem NH-27 Kotwa-Mehsi-Muzaffarpur
Maithi NH-27, Km 26.2 Muzaffarpur-Darbhanga
Raje (Old Naraur) NH-27, Km 88.0 Darbhanga-Asanpur
Asanpur NH-27, Km 150.4 Asanpur-Forbesganj
Hariabara NH-27, Km 244.9 Forbesganj-Purnea
Barsoni NH-27, Km 416.0 Purnea-Dalkola
Shahpur NH-31, Km 232.6 Simaria-Khagaria
Balgudar NH-80, Km 23.5 Mokama-Munger
Jichho (Bhagalpur Bypass) NH-80 Bhagalpur Bypass
Toda NH-82, Km 128 Bihar Sharif-Barbigha-Mokama
Mahanth Maniyari NH-122 Muzaffarpur-Barsoni
Saidpur Patedha NH-22 Hajipur-Muzaffarpur
Runni Saidpur NH-22, Km 28.9 Muzaffarpur-Sonbarsa
Kulhariya NH-922 Koilwar-Bhojpur
Dalsagar NH-922 Bhojpur-Buxar

Plaza names, highway numbers and chainage follow the NHAI Toll Information System list. Gazette-notified rates for each plaza are published on TIS. At Kulhariya (NH-922) the car toll rose from Rs 105 to Rs 110 on August 1, 2026 after a change of operator.

Multi-Axle Vehicle Rates at Mohania (April 2026)

Vehicle Class Description Single-Trip Rate (Rs) Without FASTag (2x)
Car/Jeep/Van Light motor vehicle 65 130
LCV/Mini-Bus Light commercial vehicle, light goods vehicle or mini bus 105 210
2-Axle Bus/Truck Bus or truck (two axles) 225 450
3-Axle Vehicle Three-axle commercial vehicle 350 700
4-6 Axle / HCM-EME Heavy construction machinery, earth moving equipment or multi-axle vehicle (4 to 6 axles) 350 700
7+ Axle Oversized Oversized vehicle (7 or more axles) 430 860
Two-Wheelers Motorcycles, scooters Exempt at national highway fee plazas N/A

Pass and Discount Rates (FY 2026-27)

Pass / Discount Rate Eligibility
Return journey (within 24 hours) About 1.5x the single-trip rate (Mohania car: Rs 65 single, Rs 100 return); exact figure per plaza notice All FASTag vehicles
Local monthly pass (20 km radius) Reduced rate, varies by plaza (Rs 350 at Mohania, Sasaram, Maranga and Kharik; Rs 360 at Deederganj for FY 2026-27) Non-commercial vehicles registered within 20 km of the plaza
FASTag Annual Pass (FY 2026-27) Rs 3,075 one-time (200 crossings or 1 year) Non-commercial private vehicles (car, jeep, van) with a valid FASTag at national highway and expressway fee plazas; state-managed stretches are charged separately
UPI payment (no FASTag) 1.25x standard rate Vehicles without FASTag at plazas with UPI-enabled lanes

How to Pay Bihar Tolls

The following payment methods are available at Bihar toll plazas:

1. FASTag (Recommended)

  • RFID sticker affixed to windscreen; deducted automatically at each boom barrier
  • Available from authorised issuer banks, NHAI/IHMCL channels, and online via issuing bank apps
  • Tag price, security deposit and minimum recharge vary by issuing bank; confirm with the bank before purchase
  • Works at all 1,150+ NHAI plazas nationwide; a FASTag from any Indian state works at all Bihar plazas
  • Maintain at least Rs 500 buffer above estimated trip cost to avoid blacklisting mid-route

2. NHAI Apps and Helpline

  • Rajmargyatra (official NHAI/IHMCL app and web portal at Rajmargyatra: FASTag account management, balance top-up, Annual Pass purchase, transaction history, plaza-wise rates along a route, plaza complaint submission
  • My FASTag app: wallet recharge and tag status check
  • NHAI helpline: 1033 (24x7, toll-free) for emergencies, plaza complaints, and FASTag issues

3. UPI and Cash (Fallback)

  • Dedicated cash lanes are being eliminated at national highway plazas under the MoRTH Zero-Cash direction from April 10, 2026; follow lane signage at the plaza
  • UPI is accepted at plazas with UPI-enabled lanes at 1.25x the standard rate
  • Where cash is still accepted, a vehicle without a valid FASTag pays 2x the standard rate

4. GNSS-Based Tolling (Pilot)

  • GNSS-based tolling is being introduced in phases across India; FASTag continues alongside during the transition
  • NHAI is moving toward barrier-free Multi-Lane Free Flow (MLFF) tolling; the Mokama-Munger expressway section approved in September 2025 is designed with close tolling

To calculate toll costs for cars, trucks, motorcycles and all vehicle types on Bihar routes, use the TollGuru Bihar toll calculator:

Bihar State Highway and Bridge Tolls

Until 2026, toll collection in Bihar was limited to national highways. The Bihar Road User Fee Rules, 2026 introduce a framework for per-kilometre user fees on selected state highways, major bridges, bypasses and tunnels, with FASTag as the main payment mode. Rates depend on vehicle class and road width.

Key Points:

  • State highways narrower than 5.5 metres and sections inside municipal areas are not tolled
  • Non-payment attracts a penalty of three times the applicable toll
  • Private non-commercial vehicles have been announced as exempt on state highways; commercial vehicles pay per-kilometre rates
  • The FASTag Annual Pass applies to national highway and expressway fee plazas only; state-managed stretches are charged separately
  • The list of tolled sections is notified by the Road Construction Department; check its notifications before travel

Enforcement and Penalties

NHAI enforces toll compliance at Bihar plazas through RFID readers, ANPR cameras, and a national e-notice system active from March 2026. NH-19 plazas are among the busiest on the network and see active enforcement given the high freight traffic on the Grand Trunk Road corridor.

Key Penalty Rules:

  • FASTag lane violation: 2x the standard toll rate charged immediately
  • FASTag blacklisting: Triggered by insufficient balance, expired KYC, or vehicle registration mismatch. NPCI rules allow a short window around the plaza read time to fix an inactive or low-balance tag before a penalty applies, so recharge immediately if you are warned
  • Tag misuse: Using one FASTag for multiple vehicles, or holding the tag by hand instead of affixing it to the windscreen, results in tag deactivation
  • E-notice system (from March 17, 2026): Unpaid tolls recorded by FASTag readers and ANPR cameras trigger an SMS/email e-notice to the registered owner. Paying the original toll within 72 hours avoids the penalty; after that the unpaid fee is 2x. A representation can be filed within 72 hours and must be decided within 5 days. If dues stay unpaid beyond 15 days with no representation pending, they are recorded in VAHAN and vehicle-related services can be restricted
  • 100-metre / 10-second rule: If a queue at a plaza exceeds 100 metres or per-vehicle service time exceeds 10 seconds, vehicles may pass toll-free until congestion clears (plaza discretion)

Exempt Vehicles:

  • Presidential, Governor and Vice-Presidential convoys
  • Armed Forces, paramilitary, and fire service vehicles on duty
  • Ambulances and medical emergency vehicles
  • Other categories listed in Rule 11 of the National Highways Fee Rules, 2008 (confirm through NHAI exemption queries)
  • Two-wheelers at national highway fee plazas

Recent Changes (2026)

March 17, 2026 - E-Notice System:

  • NHAI introduced the e-notice system for unpaid toll through the National Highways Fee (Second Amendment) Rules, 2026; pay the original toll within 72 hours to avoid the 2x unpaid fee, with unpaid dues recorded in VAHAN after 15 days

April 1, 2026 - National Rate Revision:

  • WPI-indexed annual revision applied across all NHAI plazas in Bihar; rates at individual plazas are gazette-notified by concessionaire
  • FASTag Annual Pass revised from Rs 3,000 to Rs 3,075 for FY 2026-27; valid for 200 crossings or one year
  • Deederganj (NH-30) rates rose by 3.7% to 7.7% and the local monthly pass rose from Rs 340 to Rs 360

April 10, 2026 - MoRTH Zero-Cash Policy:

  • MoRTH directed elimination of dedicated cash lanes at national highway plazas; Bihar plazas are transitioning to FASTag/UPI-only operations progressively

July 2026 - Bihar Road User Fee Rules:

  • Bihar notified the Road User Fee Rules, 2026 for per-kilometre tolling on selected state highways, major bridges, bypasses and tunnels; private non-commercial vehicles are announced as exempt

August 1, 2026 - NH-922 Kulhariya Plaza:

  • Revised toll came into effect at Kulhariya on the Patna-Buxar road; the car toll rose from Rs 105 to Rs 110 under a new operator

Major Infrastructure Projects (2026):

  • Patna-Purnea Expressway: Announced in Union Budget 2024 under the Purvodaya eastern development plan; expected to cut the Patna-Purnea journey from over six hours to about three
  • Buxar-Bhagalpur Expressway: Also announced under Purvodaya; the Mokama-Munger four-lane section (82.4 km, Rs 4,447.38 crore) received Cabinet approval on September 10, 2025 on Hybrid Annuity Mode with close tolling; construction is expected to begin after the 2026 monsoon
  • Varanasi-Ranchi-Kolkata Greenfield Expressway: Bihar section of about 170 km in seven packages across Kaimur, Rohtas, Aurangabad and Gaya; construction is underway on several stretches and a realignment near the Adhaura hills in Kaimur has been proposed
  • Raxaul-Haldia Six-Lane Expressway (Bharatmala): Runs from Raxaul on the Nepal border through East Champaran, Sheohar, Muzaffarpur, Samastipur, Begusarai, Lakhisarai, Munger and Banka, then through Jharkhand to Haldia Port; about 585 km in total with roughly 408 km in Bihar under the MoRTH-cleared alignment; land acquisition underway; expected to cut Raxaul-Haldia travel to under 10 hours
  • Gorakhpur-Siliguri Expressway (417 km, Bharatmala): Bihar section passes through West and East Champaran, Sheohar, Sitamarhi, Madhubani, Supaul, Araria and Kishanganj; land acquisition is under way and construction had not started as of August 2026
  • Amas-Darbhanga Expressway: Links south and north Bihar; construction underway in four packages and about 40% complete
  • J.P. Ganga Path extensions (BSRDC): The Digha-Sherpur-Koilwar extension and Ganga Path sections linking Munger, Sultanganj, Bhagalpur and Sabour were put out for bid on Hybrid Annuity Mode in 2025
  • Kacchi Dargah-Bidupur Bridge over the Ganga (9.76 km main bridge, Patna-Hajipur): Built by BSRDC; the first lane opened on June 23, 2025 and the full six-lane bridge was reported complete in 2026, pending formal commissioning

Planning Your Journey

Major Corridor Tips:

  • NH-19 (Grand Trunk Road, UP border to Jharkhand border): Bihar's busiest freight corridor; BOT plazas at Daffi, Mohania and Sasaram, followed by Saukala near Aurangabad. Heavy vehicle queues can be long at peak freight hours; FASTag is essential to avoid penalty rates and delays
  • NH-83 (Patna-Gaya-Bodh Gaya): Key pilgrimage and tourist route; Devkuli and Jindapur plazas serve the Patna-Gaya-Dobhi section
  • NH-30 (Patna-Bakhtiyarpur): Deederganj plaza on the four-lane Patna-Bakhtiyarpur stretch (46.8 km tollable length); all payments are collected electronically through FASTag
  • NH-20 (Bakhtiyarpur-Rajauli): Karigawan plaza serves this section
  • NH-27 (Muzaffarpur-Darbhanga-Purnea, old NH-57): Important north Bihar agricultural corridor with Maithi, Raje, Asanpur, Hariabara and Barsoni plazas
  • NH-31 (Khagaria-Purnea/northeast Bihar): Shahpur, Kharik and Maranga plazas on this corridor serve the northeast Bihar agricultural and border trade corridor toward West Bengal

Practical Tips:

  • Recharge FASTag before entering the NH-19 corridor; the Varanasi-Aurangabad-Dhanbad stretch has multiple consecutive plazas in Bihar and Jharkhand
  • Return journey within 24 hours costs roughly 1.5x the single-trip rate rather than 2x; the exact return fare is on each plaza notice, so plan same-day round trips to save
  • The Rs 3,075 Annual Pass covers up to 200 plaza crossings or one year, whichever comes first, and pays for itself if your yearly toll bill would exceed Rs 3,075
  • Monsoon flooding (June-September) can close low-lying NH sections in north Bihar; check NHAI advisories before travel in the Muzaffarpur, Darbhanga, and Supaul districts
  • Most state highways and district roads remain free of toll and are generally slower; selected state highways, bridges and bypasses can be tolled under the Bihar Road User Fee Rules, 2026, with private non-commercial vehicles announced as exempt

Frequently Asked Questions

Can I avoid toll plazas in Bihar?

Yes, by using state highways and district roads, which are generally slower. National highways are considerably faster and better maintained, making the toll cost generally worthwhile. Selected state highways and bridges can charge a user fee under the Bihar Road User Fee Rules, 2026.

Do motorcycles pay tolls in Bihar?

Two-wheelers are exempt from toll charges at national highway fee plazas in Bihar. They can use dedicated two-wheeler lanes at toll plazas. This exemption applies to motorcycles and scooters.

What happens if my FASTag balance runs out on NH-19?

Your tag can be rejected or blacklisted, and the vehicle is charged 2x (or 1.25x through UPI) at the plaza. NPCI rules allow a short window around the plaza read time to fix a low-balance or inactive tag before a penalty applies. Recharge via the Rajmargyatra app or your issuing bank app, or call NHAI helpline 1033. Given multiple consecutive plazas on NH-19, always maintain a Rs 500+ buffer.

Is the FASTag Annual Pass worth it for Bihar travel?

For non-commercial private vehicles that cross national highway fee plazas often, the Rs 3,075 annual pass is worth buying if your yearly toll would otherwise exceed that amount. It covers 200 crossings or one year, whichever comes first, at national highway and expressway fee plazas nationwide, not just in Bihar. State-managed stretches are charged separately.

Are toll rates the same at all Bihar plazas?

No. Each plaza has gazette-notified rates based on its tollable length, road category (BOT concession or public-funded), and capital cost. Sasaram on NH-19 has a longer tollable stretch (94.8 km) than Mohania (42.6 km), so its rates are proportionally higher.

When will the new Bihar expressways be tolled?

The Patna-Purnea and Buxar-Bhagalpur expressways were announced in Union Budget 2024 under the Purvodaya eastern development plan. The Raxaul-Haldia and Gorakhpur-Siliguri corridors are Bharatmala projects also running through Bihar. The Buxar-Bhagalpur Mokama-Munger section received Cabinet approval in September 2025 and construction was expected to begin after the 2026 monsoon. Toll collection begins on each section as it is handed over operationally, not at overall project completion.

Bihar vs. Neighbouring States and Countries

State / Country System Typical Car Rate Key Feature
Bihar FASTag RFID + UPI fallback; cash lanes being phased out Rs 65-150 per plaza NH-19 Grand Trunk Road corridor; multiple expressways under development
India (National NHAI Network) FASTag RFID + GNSS pilot; 1,150+ plazas Rs 50-215 per plaza Annual pass Rs 3,075 for FY 2026-27; Zero-Cash policy April 2026
Uttar Pradesh (western neighbour on NH-19) FASTag RFID + expressway tolling Rs 70-200 per plaza Dense plaza network; Purvanchal and Agra-Lucknow Expressways active
Jharkhand (eastern neighbour on NH-19) FASTag RFID Rs 80-175 per plaza Dhanbad-Ranchi industrial corridor; same NHAI FASTag system as Bihar
Bangladesh Cash + electronic (mixed) BDT 50-200 per plaza Expanding expressway network; Padma Bridge corridor active

Official Resources

Found outdated content or toll information? Join us to keep toll information accurate.

Cookies help us deliver our services. By using our services, you agree to our use of cookies.