From Toll Wiki

(Created page with "{{DISPLAYTITLE: Gorakhpur Link Expressway 2025: Complete Guide - Newly Inaugurated Eastern UP Connector}} {{#seo:|title=Gorakhpur Link Expressway 2025: Complete Guide - Newly...")
 
 
Line 333: Line 333:
 
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
 
<ul style="font-size: 16px; color: #202122; font-family: Georgia, 'Times New Roman', serif; line-height: 1.6; margin: 5px 0; padding-left: 30px;">
 
<li>[[purvanchal-expressway|Purvanchal Expressway]] - Main connection at Azamgarh/Salarpur</li>
 
<li>[[purvanchal-expressway|Purvanchal Expressway]] - Main connection at Azamgarh/Salarpur</li>
<li>[[uttar-pradesh-toll-road|Uttar Pradesh Toll Roads]] - Complete UP expressway network</li>
+
<li>[[uttar-pradesh-toll-roads|Uttar Pradesh Toll Roads]] - Complete UP expressway network</li>
 
<li>[[india-toll|India Toll]] - National toll road system information</li>
 
<li>[[india-toll|India Toll]] - National toll road system information</li>
 
</ul>
 
</ul>

Latest revision as of 11:09, 8 July 2025



Click on the map to open toll wiki for a country/state

Gorakhpur Link Expressway Complete Guide

Route: Jaitpur (Gorakhpur) to Salarpur (Azamgarh) - 91.35 km
System: 4-lane access-controlled expressway (expandable to 6)
Toll Rate: ₹2.20/km (₹200 full journey for cars)
Connection: Links Gorakhpur to Purvanchal Expressway at Azamgarh
Inaugurated: June 20, 2025 by CM Yogi Adityanath

Do I Need FASTag for Gorakhpur Link Expressway? 2025 Update

Yes, FASTag is highly recommended for seamless travel on the newly opened Gorakhpur Link Expressway. The expressway features modern toll collection systems with both FASTag and cash payment options at its 2 toll plazas.

Key Reality: This newest addition to UP's expressway network provides the missing link between Gorakhpur and the Purvanchal Expressway, dramatically reducing travel time from Gorakhpur to Lucknow from 6 hours to just 3.5 hours.

2025 Update: Inaugurated on June 20, 2025, by CM Yogi Adityanath, this expressway represents UP's 7th operational expressway and extends the state's access-controlled network to eastern districts previously underserved by modern highway infrastructure.

Gorakhpur Link Expressway Toll Costs: Current Rates

The Gorakhpur Link Expressway operates on distance-based pricing at ₹2.20 per kilometer, making it cost-effective for the significant time savings provided to eastern UP travelers.

Current Toll Rates - 2025

Vehicle Type Full Journey (91.35 km) Per KM Rate Time Savings
Car/Jeep/Van ₹200 ₹2.20/km 1.5 hours saved
Light Commercial Vehicle ₹320 ₹3.50/km 1.5 hours saved
Bus/Truck (2-Axle) ₹650 ₹7.10/km 2 hours saved
Heavy Vehicle (3+ Axles) ₹990 ₹10.85/km 2 hours saved

Strategic Route Connections

Route Old Travel Time New Travel Time Time Saved
Gorakhpur to Lucknow 6 hours 3.5 hours 2.5 hours (42%)
Gorakhpur to Delhi 10-11 hours 7-8 hours 3 hours (30%)
Gorakhpur to Agra 9 hours 6.5 hours 2.5 hours (28%)
Gorakhpur to Ayodhya 4 hours 2.5 hours 1.5 hours (38%)

How to Pay Gorakhpur Link Expressway Tolls

The newly operational expressway features modern toll collection infrastructure across its 2 toll plazas:

1. FASTag (Recommended):

  • Automatic toll deduction using RFID technology
  • Works at both toll plazas on the expressway
  • Interoperable with all UP expressways and 350+ toll plazas nationwide
  • Faster lane movement with no stopping required

2. Cash Payment:

  • Available at manned toll booths
  • Same rates as FASTag (no additional charges)
  • Recommended to carry exact change for faster processing
  • Longer waiting times expected during peak hours

3. Digital Integration:

  • ANPR (Automatic Number Plate Recognition) system
  • Integration with UPEIDA's Expressway Mitra app
  • Real-time traffic monitoring and incident reporting

Route & Districts Connected

The Gorakhpur Link Expressway passes through 4 districts in eastern Uttar Pradesh, providing crucial connectivity to previously underserved regions.

Districts Connected (West to East)

  • Gorakhpur - Major eastern UP city, starting point at Jaitpur village on NH-27
  • Sant Kabir Nagar - Agricultural district with significant rural population
  • Ambedkar Nagar - Educational and administrative center in eastern UP
  • Azamgarh - Connection point to Purvanchal Expressway at Salarpur village

Land Acquisition & Development

  • Total Land Acquired: 1,148.8 hectares from 172 villages
  • Farmer Compensation: ₹2,030 crore paid to over 22,000 farmers
  • Acquisition Model: Peaceful process with fair compensation
  • Construction Approach: EPC (Engineering, Procurement, Construction) mode

Infrastructure & Technical Features

Complete Infrastructure Portfolio

Infrastructure Type Quantity Purpose
Toll Plazas 2 Revenue collection and traffic management
Ramp Plazas 3 Entry/exit point management
Flyovers 7 Grade-separated crossings
Major Bridges 7 River and major road crossings
Minor Bridges 27 Local drainage and crossings
Vehicular Underpasses 16 Local road connectivity
Light Vehicle Underpasses 50 Smaller vehicle access
Pedestrian Underpasses 35 Safe pedestrian crossings

Advanced Technology Systems

  • CCTV Surveillance: Comprehensive monitoring along entire route
  • ANPR Technology: Automatic number plate recognition for security
  • Speed Monitoring: Electronic speed enforcement systems
  • Traffic Management: Advanced traffic management systems (ATMS)
  • Emergency Response: Dedicated helpline and patrol vehicles

Construction Challenges Overcome

  • Low-lying Terrain: Special soil filling techniques used in Gorakhpur region
  • Flood-prone Areas: Enhanced drainage and elevated construction
  • Quality Construction: Built to withstand annual monsoon challenges
  • Rapid Completion: Finished ahead of schedule despite terrain challenges

Project Timeline & Development

Key Milestones

Date Milestone Progress
2018 Project Announced CM Yogi Adityanath conceptualizes project
February 2019 Land Acquisition Begins Peaceful acquisition process initiated
October 2019 50% Land Acquired Construction divided into 2 packages
2020-2022 Construction Phase APCO Infratech and Dilip Buildcon execution
May 2024 Near Completion 98% construction work completed
June 20, 2025 Official Inauguration CM Yogi Adityanath opens to public

Construction Partnership

  • Package I: Jaitpur to Phulwaria (48.3 km) - APCO Infratech
  • Package II: Phulwaria to Salarpur (43.0 km) - Dilip Buildcon
  • Total Project Cost: ₹5,876 crore (including land acquisition)
  • Construction Cost: ₹3,024 crore (excluding land)

Economic Impact & Regional Development

Immediate Benefits (2025)

  • Travel Time Reduction: Gorakhpur-Lucknow journey cut by 2.5 hours
  • Fuel Efficiency: 30-40% reduction in fuel consumption due to smooth flow
  • Pollution Reduction: Lower emissions from reduced congestion
  • Emergency Access: Faster medical and emergency services connectivity
  • Educational Access: Easier travel to major educational centers

Long-term Economic Impact

  • Industrial Development: Enhanced logistics for handloom, dairy, food processing
  • Agricultural Markets: Direct connectivity for farmers to major urban markets
  • Tourism Growth: Improved access to religious sites in eastern UP
  • Real Estate Boom: Property value increases in connected districts
  • Employment Generation: Jobs in logistics, services, and manufacturing sectors

Strategic Positioning

  • UP Network Integration: Completes eastern connectivity in state expressway grid
  • National Connectivity: Links eastern UP to Delhi-Mumbai industrial corridor
  • Border Trade: Enhanced connectivity toward Nepal border region
  • Future Expansion: Foundation for planned Gorakhpur-Siliguri Expressway

Frequently Asked Questions

When was the Gorakhpur Link Expressway opened?

The expressway was officially inaugurated on June 20, 2025, by CM Yogi Adityanath, making it UP's 7th operational expressway and the newest addition to the state's access-controlled highway network.

How much time does it save for Gorakhpur-Lucknow travel?

The journey from Gorakhpur to Lucknow is reduced from 6 hours to just 3.5 hours - a savings of 2.5 hours (42% reduction). This dramatic improvement connects eastern UP much more efficiently to the state capital.

Are two-wheelers allowed on this expressway?

No, motorcycles, scooters, and three-wheelers are prohibited for safety reasons. The expressway is designed as an access-controlled highway for four-wheelers and above, with speed limits up to 100 km/h for cars.

How does this expressway connect to other UP expressways?

It connects directly to the Purvanchal Expressway at Salarpur in Azamgarh, which then links to the Agra-Lucknow Expressway at Lucknow, creating a seamless route from Gorakhpur to Delhi via the Yamuna Expressway.

What was the total cost of the project?

The total project cost was ₹5,876 crore including land acquisition (₹2,030 crore for farmer compensation), with construction costs of ₹3,024 crore. The project acquired 1,148.8 hectares from 172 villages.

Useful Links & Resources

Related Expressways:

Emergency Contacts:

  • UPEIDA Helpline: 1800-419-0139 (24/7)
  • Emergency Services: 112
  • Expressway Patrol: Available along route
  • Medical Emergency: Nearest hospitals in Gorakhpur and Azamgarh

Found outdated content or toll information? Join us to keep toll information accurate.

Cookies help us deliver our services. By using our services, you agree to our use of cookies.