From Toll Wiki

Revision as of 07:51, 7 July 2025 by Asijitp (talk | contribs) (Created page with "{{DISPLAYTITLE: Mackenzie-Wismar Bridge Toll 2025: Becoming Toll-Free August Complete Guide}} {{#seo:|title=Mackenzie-Wismar Bridge Toll 2025: Becoming Toll-Free August Comple...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)



Click on the map to open toll wiki for a country/state

Mackenzie-Wismar Bridge Complete Guide

System: Manual toll collection (becoming toll-free August 2025)
Coverage: Single crossing between Wismar and Mackenzie, Linden, Region 10
Currency: Guyanese Dollar (GYD)
Technology: Manual collection system, single-lane traffic control
Operators: Linden Town Council and Linmine Secretariat

Do I Need to Pay Tolls for Mackenzie-Wismar Bridge? 2025 Update

Yes, you currently need to pay a toll to cross the Mackenzie-Wismar Bridge - but this will end on August 1, 2025. President Dr. Irfaan Ali announced the elimination of all bridge tolls in Guyana as part of a major infrastructure development initiative.

Key Reality: The current bridge charges $60 GYD for cars, providing $6 million monthly revenue to Linden Town Council. After August 2025, all crossings will be free while a new $35 million four-lane bridge is under construction.

2025 Update: New 220-meter four-lane bridge construction is in pile works phase, scheduled for completion April 2026. The 58-year-old current bridge will become toll-free before the replacement opens.

Mackenzie-Wismar Bridge Toll Costs: What You Actually Pay

The bridge operates a simple manual toll system with fixed rates by vehicle type until August 1, 2025.

Current Toll Rates by Vehicle Class (Until August 2025)

Vehicle Type Current Rate (GYD) USD Equivalent August 2025 Rate
Cars and Minibuses $60 ~$0.29 FREE
Motorcycles Variable (Lower) ~$0.15 FREE
Motor Lorries/Trucks Variable (Higher) ~$0.50 FREE
Cyclists and Pedestrians FREE $0.00 FREE

Bridge Operations (2025)

Current Bridge: Single-lane operation with manual traffic control system, built 1965-1967

New Bridge (2026): Four-lane concrete structure, 220 meters long, toll-free operation

How to Pay Mackenzie-Wismar Bridge Tolls

You can use the following methods to pay tolls until August 1, 2025:

1. Cash Payment:

  • Guyanese Dollars: Primary payment method at toll booth
  • Manual collection system with attendant
  • Exact change recommended for faster processing

2. Traffic Control System:

  • Single-lane alternating traffic pattern
  • Manual signal control during peak hours
  • Extended wait times common during rush periods

To calculate current and future toll costs for all vehicle types across Guyana bridges, use TollGuru Guyana toll calculator

Recent Changes (2025)

Toll Elimination Announcement:

  • August 1, 2025: All tolls on Mackenzie-Wismar Bridge to be eliminated
  • Part of nationwide bridge toll elimination including Demerara and Berbice bridges
  • Government taking over $6 million monthly revenue loss from Linden Town Council

New Bridge Construction:

  • $35 million contract signed with China Railway Construction Corporation
  • Pile works phase underway as of May 2025, scheduled completion April 2026
  • Four-lane concrete design with 32m horizontal clearance, 11.5m vertical clearance
  • 2-meter-wide sidewalks on both sides for pedestrians and cyclists

Strategic Infrastructure Development:

  • Part of Georgetown-to-Lethem corridor connecting Guyana to Brazil
  • Positioning Region 10 as logistics hub for Caribbean-Latin America trade
  • Connection to 45 bridges being constructed on Linden-Lethem highway

Regional Toll Information

Guyana - Major Bridge Network Transformation:

  • Demerara River Bridge - $200 GYD toll ending August 2025
  • Berbice River Bridge - $1,900 GYD toll ending August 2025
  • Mackenzie-Wismar Bridge - $60 GYD toll ending August 2025
  • All new bridges to be constructed toll-free from opening

Linden Region Infrastructure:

  • Current bridge: Critical connection between Wismar (west bank) and Mackenzie (east bank)
  • Originally built for bauxite ore transportation from mines to processing facility
  • Strategic location for Georgetown-Lethem highway corridor development

Planning Your Journey

Cost Considerations:

  • Current tolls: $60 GYD (~$0.29 USD) for cars until August 1, 2025
  • Post-August 2025: Zero toll costs for all vehicle types
  • Major cost savings for daily commuters and regional transport

Traffic Considerations:

  • Current bridge: Single-lane operation causes delays during peak periods
  • Bridge length: Less than quarter mile but manual control causes bottlenecks
  • 2026 improvements: Four-lane operation will eliminate traffic control delays

Alternative Routes:

  • No alternative crossing currently available between Wismar and Mackenzie
  • Bridge provides essential access to both regional hospitals
  • Emergency services depend on bridge for inter-bank connectivity

Frequently Asked Questions

When exactly will the Mackenzie-Wismar Bridge become toll-free?

August 1, 2025. President Ali announced this date for all three major Guyana bridges (Demerara, Berbice, and Mackenzie-Wismar) to eliminate tolls simultaneously.

What happens if I don't pay the current toll?

Until August 2025, toll payment is required. The bridge operates manual collection, so payment is collected before crossing. The issue becomes moot after August 1 when tolls are eliminated.

Will the old bridge remain operational after the new one opens?

The current bridge dates from 1967 and has structural concerns. The new four-lane bridge (opening April 2026) will likely replace it entirely, though specific decommissioning plans haven't been announced.

How will the government replace the lost toll revenue?

The bridge provided $6 million monthly to Linden Town Council ($70+ million annually). The government is negotiating alternative funding arrangements with local authorities to maintain municipal services.

Is this bridge part of a larger infrastructure project?

Yes, it's a key component of the Georgetown-to-Lethem corridor connecting Guyana to Brazil, including 45 additional bridges on the Linden-Lethem highway for regional trade development.

Mackenzie-Wismar Bridge vs. Regional Crossings

Crossing Current System Cost (GYD) 2025 Status
Mackenzie-Wismar Bridge (Guyana) Manual toll collection $60 Free from August 2025
Takutu River Bridge (Guyana-Brazil) No tolls $0 Remains free
Oyapock Bridge (Brazil-French Guiana) No tolls $0 Remains free
Suriname Bridges Mixed system Varies No major changes

Useful Links & Resources

Internal Navigation:

Government Resources:

  • Ministry of Public Works: Bridge construction updates and traffic information
  • Linden Town Council: Current toll collection and bridge operations
  • Linmine Secretariat: Bridge maintenance and structural oversight

Found outdated content or toll information? Join us to keep toll information accurate.

Cookies help us deliver our services. By using our services, you agree to our use of cookies.