Corentyne Bridge 2025: Future Tolls & Construction Status Complete Guide
Click on the map to open toll wiki for a country/state
Corentyne Bridge Complete Guide
System: Future toll bridge (under construction)
Coverage: Guyana (Moleson Creek) to Suriname (South Drain)
Currency: To be determined (likely USD or regional currencies)
Technology: Public-Private Partnership (DBFOM model)
Operators: China Road & Bridge Corporation (contractor)
Do I Need to Pay Tolls for Corentyne Bridge? 2025 Update
Not yet - the Corentyne Bridge is still under construction, but tolls will likely be required when it opens. The bridge is being built using a Public-Private Partnership model that typically includes toll collection to recover construction costs over the bridge's 100-year lifespan.
Key Reality: This US$236 million infrastructure project will replace the current ferry service between Guyana and Suriname, likely introducing the region's first major international toll bridge crossing.
2025 Update: China Road & Bridge Corporation has been selected as the contractor. Construction timeline remains dependent on finalizing Chinese government concessional financing, with both countries seeking to secure funding arrangements.
Corentyne Bridge Costs: What You'll Actually Pay
Toll rates have not been announced, but the Design-Build-Finance-Operate-Maintain (DBFOM) model suggests user fees will be required to fund operations and debt service.
Current vs Future Crossing Costs (2025)
Crossing Method | Current Cost | Future Bridge Cost | Status |
---|---|---|---|
Ferry Service | Varies by operator | N/A | Current method |
Passenger Cars | Ferry rates apply | TBD | Awaiting toll structure |
Commercial Vehicles | Ferry rates apply | TBD | Likely higher toll rates |
Pedestrians/Cyclists | Ferry rates apply | TBD | Bridge includes walkway |
Bridge Specifications (2025)
Length: 1,100 meters (22 spans of 50 meters each)
Capacity: 2 regular lanes + 1 emergency/controlled lane
Design Life: 100 years with vessel impact resistance
How to Pay Corentyne Bridge Tolls
Payment methods have not been announced, but modern toll bridges typically use:
1. Electronic Toll Collection (Expected):
- RFID transponder systems for frequent users
- Automatic license plate recognition
- Mobile app payment options
2. Manual Payment Options (Likely):
- Cash payment at toll booths
- Credit/debit card acceptance
- Prepaid toll cards
To calculate estimated toll costs for cars, trucks, motorcycles and all vehicle types for the future Corentyne Bridge, use TollGuru toll calculator
Recent Changes (2025)
Contractor Selection:
- December 2024: China Road & Bridge Corporation selected as winning bidder
- Contract value: US$236 million (significantly lower than Ballast Nedam's US$325 million bid)
- Construction timeline: 3 years once financing secured
Financing Developments:
- Both presidents have approached Chinese government for concessional financing
- Strategic dialogue ongoing between Guyana, Suriname, and China
- 50-50 cost sharing arrangement between both countries confirmed
Project Progress:
- Feasibility study by WSP Caribbean completed (US$2 million contract)
- Bid evaluation process completed in 2024
- Access road surveying and supporting infrastructure work underway
Regional Cross-Border Information
Guyana-Suriname Border Crossings:
- Current: Ferry service between Moleson Creek (Guyana) and South Drain (Suriname)
- Future: Corentyne Bridge with permanent road connection
- Economic impact: Enhanced trade, tourism, and regional integration
Regional Development Impact:
- Lange Island development zone: Hotels, resorts, free trade zone planned
- Continental connectivity: Links to Brazil and broader South American road network
- Oil & gas sector: Improved logistics for offshore energy activities
Planning Your Journey
Current Travel Options:
- Ferry service: Variable schedules and weather dependency
- Alternative routes: Via Brazil (longer but more predictable)
- Air travel: Regular flights between Georgetown and Paramaribo
Future Bridge Benefits:
- 24/7 crossing availability regardless of weather
- Predictable transit times for commercial operations
- Enhanced regional tourism and business connectivity
Frequently Asked Questions
When will the Corentyne Bridge open?
Construction is expected to take 3 years once financing is secured. The timeline depends on finalizing the Chinese government's concessional financing arrangements, which both countries are actively pursuing.
Will there be toll alternatives?
Ferry service will likely continue during bridge construction but may be discontinued afterward. Alternative routes via Brazil involve significantly longer travel times.
What currencies will be accepted?
Payment methods haven't been announced, but international bridges typically accept major currencies including USD, which is commonly used in both countries' cross-border trade.
Will the bridge accommodate all vehicle types?
Yes, the bridge is designed for passenger cars, trucks, and commercial vehicles, with carriageway width of 10.05 meters accommodating two lanes plus emergency access.
How will this compare to other regional crossings?
This will be the first permanent bridge between Guyana and Suriname, complementing the existing Oyapock Bridge between French Guiana and Brazil, which is toll-free.
Corentyne Bridge vs. Regional Crossings
Crossing | Countries | Toll Status | Status |
---|---|---|---|
Corentyne Bridge | Guyana-Suriname | Tolls expected | Under construction |
Oyapock Bridge | French Guiana-Brazil | Toll-free | Operational since 2017 |
Takutu Bridge | Guyana-Brazil | Toll-free | Operational |
Ferry Services | Suriname-French Guiana | Ferry fees | Current method |
Useful Links & Resources
Internal Navigation:
- Guyana Toll Roads - Current and future toll infrastructure
- Suriname Toll Roads - Road system and crossing information
- Brazil Toll Roads - Neighboring toll highway system
- Venezuela Toll Roads - Regional motorway network
Government Resources:
- Guyana Ministry of Public Works: Bridge project updates and construction progress
- Suriname Ministry of Public Works: Joint project coordination and development
- Joint Ministerial Committee: Bilateral coordination for bridge implementation
Construction Information:
- China Road & Bridge Corporation: Primary contractor for construction
- WSP Caribbean: Feasibility study and design consultant
- Regional chambers of commerce: Economic impact and business development updates