I-635 East TEXpress Lanes Complete Guide

System: Managed Toll Lanes (TollTag, TxTag, EZ TAG + ZipCash) - Opening Late 2025
Coverage: 11 miles of I-635/LBJ Freeway from US 75 to I-30 in Dallas County
Currency: US Dollar (USD)
Technology: Electronic toll collection, dynamic pricing, license plate recognition
Operators: TxDOT (owner), Pegasus Link Constructors (contractor), NTTA (billing)

When Will I-635 East TEXpress Lanes Open? 2025 Update

I-635 East TEXpress Lanes are scheduled to open in late 2025 as part of TxDOT's $1.7 billion reconstruction project. The previous HOV/Express lanes on this corridor closed in April 2020 for complete reconstruction and will reopen as full TEXpress managed toll lanes.

Key Reality: This 11-mile corridor from US 75 to I-30 represents one of the most congested stretches in Texas, handling over 230,000 vehicles daily on roadway originally designed for 180,000. The new TEXpress Lanes will provide crucial congestion relief.

2025 Update: Construction continues 24/7 with completion expected late 2025. When opened, the facility will feature two managed toll lanes alongside 10 general purpose lanes, representing nearly double the previous capacity.

I-635 East TEXpress Lanes Future Toll Structure

Based on TxDOT's managed lane system, I-635 East TEXpress Lanes will likely feature dynamic pricing similar to other TEXpress facilities in the Dallas area.

Expected Toll Structure (Upon Opening Late 2025)

Feature Current Status Expected at Opening Notes
Managed Toll Lanes Closed since April 2020 2 lanes each direction Late 2025 opening target
Dynamic Pricing Not yet implemented Real-time rate adjustments Maintains 50+ mph speeds
HOV Discounts To be announced 50% off peak periods (expected) GoCarma app registration required
Electronic Payment N/A - Construction phase TollTag, TxTag, EZ TAG NTTA billing services

Project Scope & Construction Progress (2025)

Component Previous Configuration New Configuration Status
General Purpose Lanes 8 lanes (4 each direction) 10 lanes (5 each direction) Under construction
Managed Lanes 2 HOV/Express lanes 2 TEXpress Lanes Complete reconstruction
Frontage Roads Intermittent coverage Continuous frontage roads Construction ongoing
I-635/I-30 Interchange Original 1969 design Complete reconstruction Major work underway

How to Pay I-635 East TEXpress Lanes Tolls (When Open)

When I-635 East TEXpress Lanes open in late 2025, you will be able to use the following payment methods:

1. Electronic Payment Systems (Best Rates):

  • TollTag (NTTA): Primary electronic toll system for North Texas
  • TxTag (TxDOT): State-operated transponder system
  • EZ TAG: Houston-area transponder with statewide compatibility
  • All electronic payments will provide lowest toll rates and HOV eligibility

2. ZipCash (License Plate Billing):

  • Automatic license plate recognition technology
  • Bills mailed to registered vehicle owner
  • Higher rates than electronic payment (typically 30-50% premium)
  • NTTA billing and customer service

3. Expected HOV Program:

  • 50% discount expected for HOV 2+ vehicles during peak periods
  • Motorcycle discount eligibility anticipated
  • GoCarma app registration likely required (following Dallas area standard)
  • Peak periods expected: 6:30-9 AM and 3-6:30 PM weekdays

To calculate toll costs for the Dallas area including future I-635 East TEXpress Lanes, use TollGuru toll calculator

Construction Progress & Recent Updates (2025)

Project Timeline:

  • April 2020: Previous HOV/Express lanes closed for reconstruction
  • Spring 2020: Major construction began with $1.7 billion budget
  • 2021-2024: 24/7 construction using "outside-in" approach
  • Late 2025: Expected completion and TEXpress Lanes opening

Current Construction Status (2025):

  • Frontage roads construction prioritized and nearing completion
  • Main lane reconstruction in final phases
  • I-635/I-30 interchange reconstruction ongoing
  • Bridge construction and utility relocations completed

Texas Clear Lanes Initiative:

  • Part of statewide plan to address top 100 most congested roadways
  • Designed to handle increased capacity from 230,000+ daily vehicles
  • Focus on non-tolled general purpose lane expansion alongside managed lanes
  • Coordination with Dallas County, multiple cities, DART, and utilities

Dallas Area Toll Information

Related TEXpress Lanes Networks:

NTTA Toll Roads in Dallas Area:

Planning Your Journey

Current Travel Considerations (During Construction):

  • No managed lanes available on this corridor until late 2025
  • General purpose lanes maintained during peak periods
  • Major lane closures occur during overnight hours and weekends
  • Allow extra travel time for construction delays

Future Benefits (Upon Opening Late 2025):

  • Two managed toll lanes providing congestion relief
  • Five general purpose lanes in each direction (up from four)
  • Continuous frontage roads for local access
  • Modern interchange design at I-635/I-30

Alternative Routes During Construction:

  • I-30: East-west travel bypass south of I-635
  • I-20: Southern alternative for cross-Dallas travel
  • US 75: North-south alternative through eastern Dallas
  • Local surface streets: Slower but available during peak construction

Frequently Asked Questions

When will I-635 East TEXpress Lanes open?

TxDOT expects I-635 East TEXpress Lanes to open in late 2025 as part of the $1.7 billion reconstruction project. The previous HOV/Express lanes have been closed since April 2020 for complete rebuilding.

How is this different from the main LBJ TEXpress Lanes?

I-635 East TEXpress Lanes (US 75 to I-30) are operated by TxDOT as a separate project from the LBJ TEXpress Lanes (Luna Road to Greenville Avenue) operated by LBJ Infrastructure Group. Different pricing and policies will apply.

Will toll rates be similar to other TEXpress Lanes?

While specific rates haven't been announced, I-635 East TEXpress Lanes will likely feature dynamic pricing similar to other TxDOT managed lane projects, with rates adjusting based on traffic conditions to maintain free-flowing speeds.

Can I get construction updates?

Yes, text "635 East" to 1-833-HWY-635E for construction alerts, or visit 635east.com for project updates, lane closures, and progress information. Email alerts are also available at info@635east.com.

Why was this corridor chosen for reconstruction?

I-635 East is one of Texas' top 30 most congested roadways, carrying 230,000+ vehicles daily on infrastructure designed for 180,000. It's part of the Texas Clear Lanes initiative addressing critical congestion points statewide.

Texas vs. Regional States

Location System Type Typical Cost Coverage
Texas Dynamic pricing managed lanes + traditional tolls $0.75-$10.00 per segment Major metropolitan areas
Canada Traditional tolls + express lanes CAD $0.25-$4.50 Ontario and select provinces
Mexico Cash and electronic tolls $0.50-$15.00 USD Federal highways (autopistas)
United States Varies by state $0.05-$0.50 per mile 25+ states with toll roads

Useful Links & Resources

Internal Navigation:

Project Information & Updates:

  • TxDOT 635 East Project: 635east.com - Official project website
  • Construction Alerts: Text "635 East" to 1-833-HWY-635E
  • Project Email: info@635east.com - General inquiries and updates
  • NTTA Customer Service: 972-818-NTTA (6882) - Future billing support