laos-toll
Click on the map to open toll wiki for a country/state
Laos Toll Roads 2025: Complete Guide
System: Lao-China Expressway Electronic Toll Collection
Operator: China Yunnan Construction and Investment Holding Group (YCIH)
Currency: Lao Kip (LAK) / US Dollar (USD)
Coverage: Vientiane-Vang Vieng Expressway (113.5 km operational)
Technology: Electronic Toll Collection (ETC) and manual toll gates
Do I Need to Pay Tolls in Laos? 2025 Update
Currently, Laos has only one operational toll road - the Vientiane-Vang Vieng Expressway, which is part of the planned Lao-China Expressway network. This is the first and only expressway in Laos.
Toll Required For:
- All vehicles using the Vientiane-Vang Vieng Expressway
- Weight-based pricing for different vehicle categories
- No motorcycles, bicycles, or pedestrians allowed
Free Alternatives:
- National Road 13 remains toll-free and parallels the expressway
- Takes approximately 4 hours vs 1.5 hours on the expressway
- 43 km longer route but no toll charges
Laos Toll Costs: Current Rates
The Lao-China Expressway uses distance-based tolling with rates adjusted based on USD-LAK exchange rate fluctuations.
Current Toll Rates (2025) - Vientiane to Vang Vieng
Vehicle Weight Category | Rate (LAK) | Rate (USD) | Distance |
---|---|---|---|
Under 2 tonnes | 139,000 LAK | ~$6.50 | 111 km |
2-5 tonnes | 231,000 LAK | ~$10.80 | 111 km |
5-10 tonnes | 322,000 LAK | ~$15.00 | 111 km |
10-15 tonnes | 460,000 LAK | ~$21.50 | 111 km |
15-20 tonnes | 598,000 LAK | ~$28.00 | 111 km |
Intermediate Access Points
The expressway has 6 intermediate entry/exit points with toll gates:
- Mouang Phonhong (Exit 56) - Near Highway 13/Highway 10 junction
- Various kilometer markers - Named by distance from Vientiane
- Proportional pricing for shorter distances
Future Network Expansion
Planned Extensions:
- Vang Vieng-Luang Prabang section (under development)
- Luang Prabang-Boten section (planned to China border)
- Vientiane-Pakse southern extension (578.6 km, $5.1 billion project)
How to Pay Laos Tolls
Payment Methods
Electronic Toll Collection (ETC):
- Pre-deposit funds into ETC account
- Automatic toll deduction at gates
- Faster transit through toll points
- ETC enrollment available at Vientiane toll gate
Manual Payment:
- Cash payment in Lao Kip at toll gates
- USD potentially accepted (check current policy)
- Toll tickets issued for each journey
Travel Requirements
- No motorcycles or bicycles allowed on expressway
- No pedestrians permitted
- Proper vehicle loading - open truck beds with passengers refused
- Vehicle damage liability - fines for road damage or accidents
Recent Changes (2025)
- Exchange rate adjustments: Toll rates fluctuate with USD-LAK exchange rate every few months
- 20% increase in November 2023: Based on currency exchange rates
- Distance measurement update: Vientiane-Vang Vieng now calculated at 111 km
- ETC system enhancement: Improved electronic payment processing
- Construction progress: Survey completed for next three expressway sections
Planning Your Laos Journey
Cost vs Time Analysis
- Expressway: 1.5 hours, ~$6.50 for cars
- Route 13 (free): 4 hours, no toll cost
- Time savings: 2.5 hours saved using expressway
- Distance difference: 43 km shorter via expressway
Travel Tips
- Speed limits: 120 km/h on flat sections, 80 km/h in mountains
- Weather considerations: Expressway designed for all-weather use
- Fuel planning: Limited services on expressway
- Alternative route knowledge: Keep Route 13 as backup option
Laos vs. Neighboring Countries
Country | System Type | Network Size | Typical Cost | Notes |
---|---|---|---|---|
Laos | Distance-based tolls | 113.5 km (expanding) | $6.50 for 111 km | Only one operational expressway |
Thailand | Distance-based tolls | Extensive network | Varies by route | Well-developed toll system |
Vietnam | Distance-based tolls | Growing network | Varies by distance | Expanding expressway system |
Cambodia | Limited tolls | Minimal network | Few toll roads | Mostly free roads |
China | Distance-based tolls | 200,000+ km | Varies by distance | Extensive expressway network |
Myanmar | Limited tolls | Minimal network | Few toll roads | Developing infrastructure |
Frequently Asked Questions
Is the Lao-China Expressway the only toll road in Laos?
Yes, currently the Vientiane-Vang Vieng section is the only operational toll road in Laos. It's the first expressway ever built in the country.
Can I avoid tolls completely in Laos?
Yes, National Road 13 runs parallel to the expressway and remains toll-free. However, travel time increases from 1.5 hours to 4 hours.
Do toll rates change frequently?
Yes, toll rates are adjusted every few months based on USD-LAK exchange rate fluctuations to maintain stable USD-equivalent pricing.
Can motorcycles use the expressway?
No, motorcycles, bicycles, and pedestrians are strictly prohibited on the expressway for safety reasons.
Is there a discount for multiple trips?
The ETC system allows pre-payment but doesn't specify discount structures. Contact toll operators for frequent user programs.
When will the full Lao-China Expressway be completed?
The project is being built in phases. The Vang Vieng-Luang Prabang section is next, with completion timelines dependent on funding and construction progress.
What happens if I damage the road?
Drivers may face fines for causing accidents or damage to expressway facilities. The road is built with heavy-duty materials for the 50-year concession period.
Expressway Features & Specifications
Technical Details
- Total planned length: Vientiane to Boten (China border)
- Current operational: 113.5 km (Vientiane-Vang Vieng)
- Construction cost: $1.5 billion for first section
- Concession period: 50 years under YCIH management
- Major infrastructure: Twin tunnels through Phoupha Mountain (900m)
Safety & Design
- Speed limits: 120 km/h (flat terrain), 80 km/h (mountains)
- All-weather capability: Designed for year-round operation
- Heavy-duty construction: Built to last 50-year concession period
- Restricted access: No slow-moving vehicles or non-motorized traffic
Future Development Plans
Northern Extension
- Vang Vieng-Luang Prabang: Survey completed, construction planned
- Luang Prabang-Boten: Connection to China border
- Total northern corridor: Complete China-Laos expressway link
Southern Extension
- Vientiane-Pakse: 578.6 km planned southern section
- Estimated cost: $5.1 billion investment
- Five sections: Parallel to National Road 13 South
- First section: 126 km Vientiane-Paksan connection
Alternative Projects
- Boten-Huay Xay highway: Connecting China border to Thailand border
- Cross-border integration: Enhanced connectivity with neighboring countries
Useful Links & Resources
- ETC System: Available at Vientiane expressway entrance toll gate
- Alternative Routes: National Road 13 for toll-free travel
- Current Information: Check with local transportation authorities for rate updates
- Construction Updates: Monitor Lao government announcements for expansion progress