Armenia North-South Corridor Complete Guide: Payment & Development 2025
Click on the map to open toll wiki for a country/state
Armenia North-South Corridor Complete Guide
System: Currently toll-free (toll roads planned for southern sections 2025+)
Coverage: 556 km Bavra (Georgia border) to Meghri (Iran border)
Currency: Armenian Dram (AMD)
Technology: Under development - electronic toll collection planned
Operators: North-South Road Corridor Investment Program SNCO, Ministry of Transport
Do I Need to Pay Tolls on Armenia's North-South Corridor? 2025 Update
Currently, no - Armenia's North-South Corridor remains completely toll-free for all vehicle types. However, the government plans to introduce first-ever road tolls in Armenia in a bid to complete an expensive project to upgrade the country's key highways, with toll collection expected to begin on new southern sections from 2025-2026.
Key Reality: The toll for the use of highways on vehicles registered in other states has been canceled since 2018. Previously, foreign-registered vehicles paid AMD 10,000 (€23) for every 15 days, but this fee was abolished.
2025 Update: Private toll roads are planned for the 350-kilometer southern section from Ararat to the Iranian border, while existing roads will remain toll-free. The new toll highways will run parallel to current free roads.
Armenia North-South Corridor: Current Status
The North-South Road Corridor (NSRC) is a highway upgrade stretching 556 km from Bavra at the Georgian border in the north, through Gyumri and Yerevan, to Meghri at the Iranian border in the south. This massive infrastructure project aims to transform Armenia into a key transit corridor between Europe and Asia.
Current Development Status by Section (2025)
Section | Status | Length | Future Tolls |
---|---|---|---|
Yerevan-Ashtarak | Completed (4-lane) | 18.4 km | Toll-free |
Ashtarak-Talin | Completed | 41 km | Toll-free |
Talin-Gyumri | Completed | 46 km | Toll-free |
Ararat-Goris (Southern) | Under development | ~200 km | Planned toll roads |
Sisian-Kajaran (Tunnel) | Under construction | 9 km tunnel | Future toll facility |
Goris-Meghri | Planning phase | ~150 km | Planned toll roads |
Strategic Importance
The highway will provide access to foreign market towards Central Asia and Europe, developing major economic spheres and export expansion (industry, agriculture, mining industry, construction, tourism). The corridor is part of the International North-South Transport Corridor (INSTC) connecting India to Russia via Iran.
How to Pay Armenia Road Fees
Currently, Armenia operates a toll-free road system. However, future toll collection methods are being planned:
1. Current Status (2025):
- All roads completely toll-free for domestic and foreign vehicles
- No vignette or road usage fees required
- No electronic toll collection systems in operation
2. Environmental Fee (Foreign Vehicles):
- Payment for the emission of harmful substances by vehicles registered in other countries entering and operating in the Republic of Armenia
- Tax varies by vehicle type and carrying capacity
- Paid at border entry in Armenian drams
3. Future Toll Systems (2025+):
- Electronic toll collection planned for new highway sections
- Private toll roads will operate parallel to existing free roads
- Payment methods to be determined during development phase
To calculate route costs and travel times across Armenia's transport network, use TollGuru Armenia route planner
Recent Changes (2025)
Project Development Updates:
- The 18.7-km section (Talin-Landjik) is 100% completed and operational
- Russian border guards transitioned protection duties to Armenian forces in 2025
- Sisian-Kajaran section with 9-km tunnel under active construction
- Private investment negotiations ongoing for southern toll sections
International Financing:
- Asian Development Bank (ADB): $330 million in long-term financing
- European Investment Bank (EIB): €12 million NIF grant support
- European Bank for Reconstruction and Development (EBRD): Active participation
- Eurasian Development Bank (EDB): Additional funding support
Economic Impact Projections:
- Once set up, it will decrease transportation costs of one ton of cargo per kilometre by US$ 2
- Expected to double average road speeds from 50 to 100 km/h
- Southern tunnel will save 54 km and up to 2 hours travel time
Regional Transport Information
Northern Connection - Armenia to Georgia:
- Bavra-Ninotsminda border crossing to Georgia toll system
- Primary route to European markets via Black Sea ports
- Bagratashen-Sadakhlo alternative crossing for Tbilisi access
- Critical for Armenia's economic connectivity with Europe
Southern Connection - Armenia to Iran:
- Meghri-Agarak border crossing to Iran transport network
- Part of International North-South Transport Corridor (INSTC)
- Access to Persian Gulf ports and Central Asian markets
- Alternative route reducing dependence on northern neighbors
Closed Borders - Turkey and Azerbaijan:
- Armenia-Turkey border closed since 1993 due to political disputes
- Armenia-Azerbaijan border largely closed due to Nagorno-Karabakh conflict
- These closures necessitate longer routes via Georgia and Iran
Planning Your Journey
Current Travel Considerations:
- No toll costs for any vehicle types throughout Armenia
- Environmental fee required for foreign-registered vehicles at entry
- Northern sections offer modern 4-lane highway conditions
- Southern sections may have challenging mountain terrain
Route Options:
- M1 Highway: Yerevan-Gyumri-Bavra (Georgia border) - fully upgraded
- M2 Highway: Yerevan-Goris-Kapan-Meghri (Iran border) - partially upgraded
- Alternative routes via secondary roads available but longer
Future Changes (2025-2027):
- New toll highways will offer faster transit for premium payment
- Existing roads will remain toll-free alternative routes
- Significant travel time reductions expected with tunnel completion
Frequently Asked Questions
Are there any tolls on Armenian roads currently?
No, Armenia currently operates a completely toll-free road system. The foreign vehicle highway fee was abolished in 2018, and no vignettes or toll payments are required for any roads.
When will tolls be introduced in Armenia?
Toll roads are planned for the southern sections from Ararat to the Iranian border, expected to begin operations around 2025-2026. These will be private toll roads running parallel to existing free roads.
Can foreign vehicles use Armenian roads?
Yes, foreign-registered vehicles can use all Armenian roads toll-free. Only an environmental fee is charged at border entry based on vehicle type and emission standards.
What is the condition of the North-South Corridor?
Northern sections (Yerevan-Gyumri) are completed with modern 4-lane highways. Southern sections are under development with challenging mountain terrain. The full corridor upgrade is expected by 2027.
Is the corridor part of international trade routes?
Yes, the North-South Corridor is a key component of the International North-South Transport Corridor (INSTC) connecting India to Russia via Iran, providing an alternative to traditional European routes.
Armenia vs. Neighboring Countries
Country | System Type | Border Status | Notes |
---|---|---|---|
Armenia | Toll-free (tolls planned) | - | Major corridor upgrade ongoing |
Georgia | Limited toll collection | Open (key transit route) | Armenia's lifeline to Europe |
Iran | No highway tolls | Open (INSTC route) | Key trade partner |
Turkey | Electronic toll system | Closed since 1993 | Political closure |
Azerbaijan | New toll roads | Mostly closed | Nagorno-Karabakh conflict |
Useful Links & Resources
Internal Navigation:
- Georgia Toll Roads - Transit route to Europe
- Turkey Toll System - Currently inaccessible border
- Azerbaijan Transport - Limited border access
- Iran Transport Network - Southern connection route
Project Authorities:
- North-South Road Corridor Investment Program SNCO: +374 10 59 01 47
- Ministry of Transport and Communication of Armenia
- Asian Development Bank Armenia: Country support office
- Road Department SNCO: Infrastructure management